My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO 2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 4:46:00 PM
Creation date
11/5/2018 11:19:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2006
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1630\PR0518624\COMPLIANCE INFO 2004-2006.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jun 05 06 04:25p Mike Dotten 2533-2650 p.2 <br /> Facility Name: Costco k 038 Stockton (Page 2) <br /> D, Results of Testing/Servicing <br /> Complete the following checklist: <br /> Software Version Installed:323.04 <br /> ®Yes ❑No* I Is the audible alarm operational? 1Z Deafening? (Outside Alarm <br /> ®Yes ❑ No* I Is the visual alarm operational? <br /> ®Yes ❑ No* I Is the print function operational? <br /> ®Yes ❑ No* I Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ®Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with then proper operation? <br /> ®Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ❑ N/A operational? <br /> Z Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shutdown? (Check all that apply) ® Sump Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shutdown due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ®Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device, is the overfill <br /> ❑N/A warning alarm visible and audible at the tank fill point(s) and operating properly? At what percent of tank <br /> capacity does the alarm trigger? 90% <br /> ❑Yes* ®No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product;❑Water. If ycs,describe causes in Section E,below. <br /> ®Yes ❑ No* Was monitoringm set-upreviewed to ensure proper settings?Attach set u reports,if applicable <br /> ®Yes ❑ No <br /> Is all monitoring equipment o erational per manufacturer's s ecificatinns? <br /> E. Comments: The 91 Turbine did not shut down as expected during the test of the liquid sensors. It is <br /> possible that the PLLD system was undergoing a test, but we need to go back in and make sure that this <br /> is the case. <br />
The URL can be used to link to this page
Your browser does not support the video tag.