My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO 2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 4:46:00 PM
Creation date
11/5/2018 11:19:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2006
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1630\PR0518624\COMPLIANCE INFO 2004-2006.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Facility Name: Costco # 038 Ston (Page 3) <br /> In-Tank Gauging: <br /> ®Check this box if tank gauging is used only for inventory control. <br /> Complete the following checklist: <br /> ®Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ®Yes ❑ No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> ®Yes ❑ No* Was accuracy of system product level readings tested? <br /> ®Yes ❑ No* Was accuracy of system water level readings tested? <br /> ®Yes ❑ No* Were all probes reinstalled properly? <br /> ®Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> ❑ Check this box if LLDs are not installed and disregard the following section. <br /> ®Yes flNo* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> Check all that a 1 Simulated leak rate: ® 3 h; ❑0.1 h; ❑0.2 h. <br /> ®Yes Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes Was the testing apparatus properly calibrated? <br /> ❑Yes For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ®Yes oFor electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ®Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ®Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ®Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ®Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: No Deficiencies. The facility is in compliance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.