My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 11:13:49 AM
Creation date
11/5/2018 11:20:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1630\PR0518624\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. UNDER-DISPENSER CONTAINMENT UD TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer U Industry Standard ❑ Professions neer <br /> ❑ Other(Speclfy) Z��6 <br /> Test Method Used: ❑Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Specify) '711 M <br /> Test Equipment Used: Incon TS-STS Sump Test System Equipment Resolution: +/_0.002" <br /> /� <br /> UDC# UDC# UDC N UDC <br /> UDC Manufacturer: Environ Environ <br /> UDC Material: Plastic Plastic <br /> UDC Depth: 26" 26" <br /> Height from UDC Bottom to Top 12" 12" <br /> of Highest Pi in Penetration: <br /> Height from UDC Bottom to 6" 6" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: Good Good <br /> Portion of UDC Tested 4"Above Pen.FAbeen.Does turbine shut down whenUDC sensor detects liquid(both ❑Yes❑No U NU NA ❑Yes❑No UNA ❑Yes❑No UNA <br /> roduct and water TTurbine shutdown reonse time N/AIs system programmed forfail- ❑yes❑No U N ®NA ❑Yes❑No ®NA ❑Yes❑No UNA <br /> safe shutdown7Was fail-safe verified to be ❑Yes❑No ®NNA ❑Yes❑No ®NA ❑Yes❑No UNA <br /> o eraUonal'TWait time between applying <br /> pressure/vacuum/water and 30 minutess <br /> starting test <br /> Test Start Time: 09:17 AM09:17 AM <br /> Initial Reading(R): 6.0309 6.6059 <br /> Test End Time: 09:32 AM 09:32 AM <br /> Final Reading(RF): 6.03 6.6062 <br /> Test Duration: 15 min. 15 min. <br /> Change in Reading(RF-RD: -0.0009 0.0003 <br /> Pass/Fail Threshold or Criteria: +/-0.002 +/-0.002 <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Yes Yes <br /> Comments—(include i)1formation on repairs made prior to testing, sad recommended ollom-Op for failed tests) <br /> Sensor functionality was not confirmed.This procedure H not part of the Secondary Containment Testing scope of work. <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See S WRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.