Laserfiche WebLink
t <br /> } <br /> I <br /> MONITORLNG AilD RESPONSE FLAN <br /> ARCO PRODtCTS COMPANY FACII,II"Y ITH <br /> Q,,ECONDARY CONTAINMENT OF <br /> UNDiERGROUND STQR.AGE. TANKS & PRODUCT LlTNES WXTII <br /> SiJBMERSiBLE PUMP SHUTDOWN <br /> ARCO Facility. 9 Address: f ..._..._... . �/!1 <br /> �' .�.Z <br /> This plan is designed to meet the monitoring and response requirements of Section 2632, Article 3, <br /> Title 23, CCR <br /> 1. MONITORING EQUIPMENT <br /> Secondarily contained storage tanks and lines at this facility are mosritored by a continuous <br /> electronic leak detection system which consists of an alarm panel, sensors and associated <br /> electronics. Liquid sensors are installed in the annu!ar space of each double ,wall tank and <br /> product line piping sump. Whenever a sensor detects the presence,of a liquid there is both a <br /> visual and audible alarm at the control panel. In addition, the continuous monitor on the <br /> product piping system will shut down the pump and activate the alarm system when a release <br /> is detected or if the continuous product piping monitoring system Oils or is disconnected, the <br /> pumping system will shut down. <br /> I <br /> Automatic line leaf: detectors are installed on the secondarily conta'ned pressIurized product <br /> piping. The line leak detector will detect a loss of pressure in the p�oduct linos and restrict <br /> the flow of product. <br /> I <br /> 2. NIATNTENANCE SCHEDULE OF NIONITORING EOUIPM.ENI <br /> I <br /> The continuous electronic leak detection systemm including line leak IlIdetectors;will be <br /> inspected according to the manufacturer's instructions by an outsid$ contractor once during <br /> each calendar year. <br /> 3. ROUTINE MONITOW G PROCEDURE <br /> On a daily basis the facility operator shall: <br /> A. Inspect the control panel for visual and audible alarm signals to confirm that <br /> the unit is operating. <br /> B. Inspect island and tank fill areas for signs of spillage or Petr I6ieum sheen <br /> C. Record the inspection observaticns on the Daily Visual Monitoring Log <br /> (Form APPC-765: attached.) <br /> 90 3rUJd 1d3G 3SH 9bTL � :tT TOOZ 'H/N <br />