My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 1999 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:35:51 PM
Creation date
11/5/2018 11:27:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2001
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> } <br /> I <br /> MONITORLNG AilD RESPONSE FLAN <br /> ARCO PRODtCTS COMPANY FACII,II"Y ITH <br /> Q,,ECONDARY CONTAINMENT OF <br /> UNDiERGROUND STQR.AGE. TANKS & PRODUCT LlTNES WXTII <br /> SiJBMERSiBLE PUMP SHUTDOWN <br /> ARCO Facility. 9 Address: f ..._..._... . �/!1 <br /> �' .�.Z <br /> This plan is designed to meet the monitoring and response requirements of Section 2632, Article 3, <br /> Title 23, CCR <br /> 1. MONITORING EQUIPMENT <br /> Secondarily contained storage tanks and lines at this facility are mosritored by a continuous <br /> electronic leak detection system which consists of an alarm panel, sensors and associated <br /> electronics. Liquid sensors are installed in the annu!ar space of each double ,wall tank and <br /> product line piping sump. Whenever a sensor detects the presence,of a liquid there is both a <br /> visual and audible alarm at the control panel. In addition, the continuous monitor on the <br /> product piping system will shut down the pump and activate the alarm system when a release <br /> is detected or if the continuous product piping monitoring system Oils or is disconnected, the <br /> pumping system will shut down. <br /> I <br /> Automatic line leaf: detectors are installed on the secondarily conta'ned pressIurized product <br /> piping. The line leak detector will detect a loss of pressure in the p�oduct linos and restrict <br /> the flow of product. <br /> I <br /> 2. NIATNTENANCE SCHEDULE OF NIONITORING EOUIPM.ENI <br /> I <br /> The continuous electronic leak detection systemm including line leak IlIdetectors;will be <br /> inspected according to the manufacturer's instructions by an outsid$ contractor once during <br /> each calendar year. <br /> 3. ROUTINE MONITOW G PROCEDURE <br /> On a daily basis the facility operator shall: <br /> A. Inspect the control panel for visual and audible alarm signals to confirm that <br /> the unit is operating. <br /> B. Inspect island and tank fill areas for signs of spillage or Petr I6ieum sheen <br /> C. Record the inspection observaticns on the Daily Visual Monitoring Log <br /> (Form APPC-765: attached.) <br /> 90 3rUJd 1d3G 3SH 9bTL � :tT TOOZ 'H/N <br />
The URL can be used to link to this page
Your browser does not support the video tag.