Laserfiche WebLink
` Monitor Certification Inspection <br /> "ARCO Products Company <br /> This letter certifies that the monitor(s) is/are in place, the probes are) correct position and the system <br /> is operating prop rl <br /> Station # Date 8 19 <br /> Address ���` Type In pecti <br /> Q Annual _ Permit <br /> _Recheck Leak <br /> Type & Model of Monitor S ' 5 <br /> System Function <br /> Tanks Annular Space In Tank <br /> Pass Fail N/A Pass Fail N A <br /> Regular �C <br /> Midgrade <br /> Supreme <br /> Waste Oil —� <br /> Other <br /> Product Lines Turbine Sump In-Line Fill Sump <br /> Pas Fail N/A Pass Fail N/A Pass Fail N/A <br /> Regular <br /> - <br /> Midgrade <br /> Supreme <br /> Waste Oily <br /> Other <br /> When monitor is turned off or in alarm, is there positive shutdown of turbines? Yes No <br /> If No, were precision product line tests performed? Yes No <br /> Monitor Panel <br /> Is the monitor panel nppunted and labeled correctly? <br /> Does monitor alarm horn function properly? <br /> Is panel accessible and visible to station personnel? t° <br /> Replaced all failed probes? Yes No N/A <br /> If No, probes to be replaced/repaired by (Date) <br /> �f -P/rfo r pr SPr1'o�S ��•�'f f�,f�. <br /> � f x <br /> Inspected By: Contractor <br /> Technician o <br /> Signature <br /> APC-3324(8/96) <br />