My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 1999 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:35:51 PM
Creation date
11/5/2018 11:27:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2001
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c) All heavy equiptnt and service vehicles should be cheu,ea at the beginning of <br /> each shift to ensure all parts, equipment and accessories are in good working <br /> condition and free of damage. <br /> d) All heavy equipment and service vehicles on the site must conform with the <br /> applicable inspection codes. <br /> e) Keep a safe distance from moving backhoes, backhoe buckets and other heavy <br /> equipment. <br /> f) All mobile equipment must be equipped with seat belts which must be worn by the <br /> operator at all times, and have approved roll over devices. <br /> g) All job site vehicles will be equipped with a service brake, parking brake and emergency <br /> brake system. <br /> B. In the event of open excavations, which is a hazard to on-site workers, the following policy <br /> regarding excavations will be followed: <br /> a) Entry into excavations greater than 5 feet deep is prohibited, unless the requirements of <br /> TS CCR 1541 are met. Do not stand next to unguarded excavations or trenches. <br /> b) Hazards associated with general construction may occur during the course of <br /> construction. Personnel should be alert and prevent as well to avoid these hazards, <br /> c) Fence and or barricades should be continuously maintained and inspected to assure a <br /> proper buffer between the work area and pedestrians/automobiles is kept. <br /> d) Minimizing the number of personal and/or equipment on site not relative to the tank <br /> preparations and tank entry procedures. <br /> C. During general construction activities, there is also a potential for general (construction type) <br /> safety hazards, This plan does not address general safety in detail. Personnel will <br /> cooperate in being courteous, careful, alert, and thoughtful of the outlined safety procedures. <br /> Common sense should be used in actions and in considering probable consequences. <br /> D. Fires may occur from sources of ignition. <br /> a) Procedures during aeration or preparation for tank entry. <br /> 1. All reasonably movable combustible materials should be removed from the <br /> work area. <br /> 2. All sources of static electricity should be mitigated. <br /> 3. A fire extinguisher having a minimum rating of 2 A, 10 BC should be maintained <br /> nearby, <br /> 4. Operations of all motorized equipment should be kept clear and/or minimized. <br />
The URL can be used to link to this page
Your browser does not support the video tag.