My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 1999 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:35:51 PM
Creation date
11/5/2018 11:27:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2001
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. PERSONAL HEALND HYGIENE to <br /> Personal safety and the safety of fellow workers require mental alertness on the part of all <br /> employees. No. alcohol or drugs shall be permitted at any job site. Intake of alcohol and <br /> prescription drugs should be limited when an employee is assigned to hazardous material <br /> remediation projects due to the potential for synergistic effects. Prescription drugs should <br /> not be taken without the express approval of a physician with knowledge of project/site <br /> activities. Eating and smoking will only take place in an approved area. Smoking on the <br /> jobsite is prohibited. <br /> ■ Personnel shall be physically able (and mentally willing) to comply with safety <br /> requirements. <br /> ■ A copy of this safety plan shall be posted at the jobsite and a copy made available to <br /> each individual who will work at the site. <br /> ■ These plans should also include and/or address as a separate plan, the Worker Hazard <br /> Communication Program. <br /> ■ Periodically scheduled "tailgate safety" meetings shall be held to review the safety <br /> program. Attendees will sign the Safety Meeting Notice. <br /> ■ Unsafe acts shall be stopped when discovered, <br /> ■ Required safety equipment shall be present on site and shall be checked to verify <br /> completeness and function prior to being put into service, <br /> ■ Sources of ignitions will be eliminated where possible. Smoking will be strictly forbidden <br /> on site. <br /> ■ The field supervisor is Pat O'Mara/or Bill McCarthy. Personnel may change depending <br /> on field conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.