My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 1999 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:35:51 PM
Creation date
11/5/2018 11:27:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2001
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corrosion protection system <br />Please describe the type of corrosion protection system you propose to install. The cathodic protection <br />system retrofitted on existing UST systems must be designed by a corrosion specialist certified by the <br />National Association of Corrosion Engineers (NAGE) or by a qualified professional engineer. Metal <br />components of the UST system (i.e. submersible pumps, piping etc) that routinely contain fuel and are in <br />contact with the ground must also be cathodically protected. <br />5. Certification: (Application will be disapproved without this information) <br />Attach detailed information as to the methods used to line the tank and a certification from the manufacturer, <br />or his authorized representative, of the tank lining material's capability to store the proposed hazardous <br />substances. <br />6. Describe the monitoring performance standard you propose to,tkse after the lining/ repair is complete. <br />Describe how the hazardous waste generated from the tank lining/repair will be managed on site. <br />(Note: all hazardous waste stored on site must be managed in accordance with Title 22 California <br />.W C\ t* <br />OnLA <br />b. Identify the contractor performing the UST decontamination: <br />Name C 1 1h C- Phone: `�D a3 S \'3y' <br />Address `wtk �)Q . City Zip 941� I <br />C. Residual Fuel Hauler: <br />Company Name AKLQ:� &4=S C�. Phone -1t 5 S� <br />Address -.-10 � i g��� �C City\�Zip <br />Transporter's ID# <br />
The URL can be used to link to this page
Your browser does not support the video tag.