My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 1999 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:35:51 PM
Creation date
11/5/2018 11:27:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2001
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PPP <br />I <br />2 <br />Prior to tank lining, a site assessment must be performed under the direction of Public Health Services <br />Environmental Health Division (PHS-EHD), site mitigation unit. <br />Site Assessment has been performed under PHS-EHD direction <br />Site Assessment has not been performed under PHS-EHD direction. Please contact PHS-EHD site <br />Migation unit at (209)468-3449 <br />Reason tanks will be interior lined/repaired: <br />Meet State/Federal upgrade requirements (submit PHS-EHD UST upgrade permit application with <br />this application) <br />Tank system failure, please describe: <br />�,+ra�r ,.,�►U ��CfAw(+, -�rrl•C .r�� \ c soe�'h� S ank <br />3. The following tests are required to be performed prior to lining to determine the structural integrity of the <br />UST: <br />Steel tanks <br />so est (Note: The UST shall be closed in accordance with Article 7 Title 23 CCR if the <br />tank's a metal thickness is less than 75 percent of the original wall thickness of if the tank <br />has a y .. ed defects in Article 6, Title 23 CCR section 2663 (b) (2) (B)) <br />Certification by a Special Inspector" that the tank is structurally sound for tank lining and continued <br />use: <br />a. sandblast to white metal <br />_b. c unt number of holes, splits, perforations, and other defects <br />----c. su it result to EHD <br />Non -steel tanks, fiberglass <br />Certification by a "Special Inspector' that the tank is suitable for lining. <br />_a. interior walls cleaned by wipe down <br />b. interior diameter measurements <br />c. visual check for structural, tension, or comp ssion problems <br />I <br />2 <br />Prior to tank lining, a site assessment must be performed under the direction of Public Health Services <br />Environmental Health Division (PHS-EHD), site mitigation unit. <br />Site Assessment has been performed under PHS-EHD direction <br />Site Assessment has not been performed under PHS-EHD direction. Please contact PHS-EHD site <br />Migation unit at (209)468-3449 <br />Reason tanks will be interior lined/repaired: <br />Meet State/Federal upgrade requirements (submit PHS-EHD UST upgrade permit application with <br />this application) <br />Tank system failure, please describe: <br />�,+ra�r ,.,�►U ��CfAw(+, -�rrl•C .r�� \ c soe�'h� S ank <br />3. The following tests are required to be performed prior to lining to determine the structural integrity of the <br />UST: <br />Steel tanks <br />so est (Note: The UST shall be closed in accordance with Article 7 Title 23 CCR if the <br />tank's a metal thickness is less than 75 percent of the original wall thickness of if the tank <br />has a y .. ed defects in Article 6, Title 23 CCR section 2663 (b) (2) (B)) <br />Certification by a Special Inspector" that the tank is structurally sound for tank lining and continued <br />use: <br />a. sandblast to white metal <br />_b. c unt number of holes, splits, perforations, and other defects <br />----c. su it result to EHD <br />Non -steel tanks, fiberglass <br />Certification by a "Special Inspector' that the tank is suitable for lining. <br />_a. interior walls cleaned by wipe down <br />b. interior diameter measurements <br />c. visual check for structural, tension, or comp ssion problems <br />
The URL can be used to link to this page
Your browser does not support the video tag.