Laserfiche WebLink
SEB 05 '99 14:40 FR CONTH I HP1EHT cSOLUT I ONEF, _4 542 5020 TO 9-15188958426 F. 02:'20 <br />CONTAINMENT <br />SOLUTIONS <br />A ]ENALI COMPANY <br />PLEASE REVIEW THE FOLLOWING INFOR1y1ATION AND FORWARD TO YOUR <br />FIELD SUPERVISOR TO AVOID DELAYS. ANY DELAYS ON SITE DUE TO <br />PERSONNEL OR TANK(S) NOT PREPARED PROPERLY WILL INCREASE JOB <br />COST. <br />Under round Tani: Entre For Inspection or Remanufacturing Page 1 of 3 <br />I. Reinforce or shore sides of excavation so pad will not undermine, and material wi11 not <br />migrate into excavated hole (per OSHA Standard 1926.650 through 1926.62) <br />- Entry through encap - will require one half of endcap diameter exposed The area <br />excavated should start N here the end cap begins to curve downward. Dig down -4', back 6'. <br />and 8' wide. (See drawing attached) <br />- Entry through manwav - already installed in tank, will require the removal of all <br />pumps or vents installed in the manwav lid. The full 22" diameter manwa- opening will be <br />utilized for tank entry. so it cannot be obstructed in any way. Loosen the manway cover <br />before th-• Technician arrives on site <br />2. Tank must be empty of fuel ( within V of bottom of tank) - Note: The Technician will <br />vent the tank to atmosphere to lower explosion levels in the tank to less than 10% LEL. <br />Get the tank as empty as possible. The more product removed from the tank will reduce the <br />time required by the technician tc vent. <br />3. An open top 55 gallon drum must be provided for Technician's use for removing or <br />soaking up any residual product left in the tank. This drum is considered hazardous waste, <br />and will be the responsibility of the owner or contractor to dispose of accordingly. If the <br />tank is extremely dirty_ you may be required to contract the services of a tank cleaninYL, <br />company <br />4. A safety person must be available to assist the Technician at all times, This person must <br />be clean shaven, and able to speak English. This person must have no other duties other <br />than assisting and monitoring the Technician. This person is supplied by the owner or <br />contractor. The same safety person should be assigned each day. This will minimize the <br />♦:...o-on..iror� :nat.+•n�:nr t�o cnia*.• Q.c..n n.+ +-,rnro+• «+r.�.nn.iron nr..a r.nl .+.ac <br />ill!!G iGii lJlt Gll IltJli UVilly LltG JGIG\� r/GIJVfl Vlt f.Jt Vt.IGl t.l1 V1rGUUt GJ Q11V FJVll V1GJ, <br />NOTE: The safety person MUST have a completion of 40 HOURS OF TRALNLNC <br />IN THE FIELD APPLICATIONS OF HEALTH AND SAFETY in compliance with <br />OSHA 29 CFR 1910.120 (HAZWOPER). <br />