My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 1999 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:35:51 PM
Creation date
11/5/2018 11:27:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2001
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 05 '99 14:41 FP.. CONTA I N•1EJT SOLUT I01 -I 814 542 5020 TO 9-15108958426 F. 0',/1^-.0 <br />5. No fuel deliveries can be made to any tank oa site while technician is inside a tank. <br />- - 5. When tank en : y is-reguired by person trained in CPR must be beside <br />the entry hole at all times when the Technician .s inside the tank. This person is in addition <br />to the safety person. If one is not available from the contracting crew, an off duty fireman, <br />nurse, EMT, or equivalent is acceptable. Besides administering CPR the person will assist <br />the safety person should an emergency rescue be required, <br />7. Our Technician will perform an air/soap tighmess test confirming his repairs to the <br />exterior of tank, and possibly identify any other potential problems on the exposed areas of <br />the tank. All efforts must be made to isolate, di3connect, or plug all the piping on tank. If <br />this test is done. and at a later date another pro'Dlem with the tank is identified, it will be the <br />financial responsibility of the owner or contractor to schedule a return trip to the site <br />S. It is important that the contractor or owner contact the appropriate local and state <br />authorities for regulations concerning the jobsite. Jobsite permits may need to be obtained <br />for the excavation or remanufacture of the tank Regulations uoverning testing of <br />underground tanks should be determined so Technician can be advised. <br />9. The contractor must disconnect the electrica: supply and remove the pump from the <br />tank. The product line at the pump must also be- disconnected or capped. This will insure <br />no fuel can enter the tank while Technician is w orking. <br />10. The water table in the tank hole must be controlled at all times. The Technician is <br />unable to remanufactur interior or exterior surf -ices if they are wet. Controlling the water <br />table will also prevent the tank from floating. <br />11. Tanks to be entered, must be triple rinsed and defumed prior to technician's arrival. <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.