My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:39:03 PM
Creation date
11/5/2018 11:33:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . IF WORKING ON TOP OF A TANK(S) IN AN UNPROTECTED HOLE <br /> WITH MORE THAN FOUR FEET OF DEPTH ON BOTH SIDES OF THE <br /> WORKER, ( INSERTING DRY ICE, ATTACHING/DETACHING SHACKLES , <br /> RINSING TANKS, ETC. ) WORKERS MUST BE HARNESSED TO A <br /> TEATHER LINE OR A STABLE OBJECT OVER THE HOLE . <br /> 5 . TEATHER LINES MUST BE NO SMALLER THAN 5/8" ROPE (NYLON) <br /> WITH A MINIMUM TENSILE STRENGTH OF 5400 LBS, INCLUDING <br /> ALL HARDWARE. THE TEATHER ROPE MUST BE ATTACHED ON EACH <br /> END TO A STATIONERY OBJECT, SUCH AS A BUILDING OR <br /> VEHICLE. IF NOT FEASIBLE, USE 2 " GALVANIZED PIPE AND <br /> BURY AT LEAST 2 FEET IN DEPTH ON EACH SIDE OF THE <br /> EXCAVATION. THEN ATTACH A CHAIN FROM THE POSTS TO A <br /> STABLE OBJECT. USE A COME-ALONG TO PULL TAUT. <br /> 6 . AN ANSI APPROVED BODY HARNESS SHALL BE CLASPED TO A <br /> LANYARD AND THEN TO THE OVERHEAD TEATHER LINE . HARNESSES <br /> SHALL NOT BE REMOVED OR DISCONNECTED WHILE INSIDE THE <br /> EXCAVATION. NO MORE THAN 2 WORKERS CAN FASTEN TO A <br /> TEATHER LINE AT ANY GIVEN TIME. <br /> 7 . IF MORE PRACTICAL, THE HARNESS/LANYARD COMBINATION MAY BE <br /> CONNECTED TO A NYLON LINE AND RUN THROUGH AN EQUIPMENT <br /> BOOM STRETCHED OVERHEAD AND MANEUVERED TO KEEP THE LINE <br /> VERTICAL. ANOTHER WORKER AT LEAST 150% HEAVIER SHALL <br /> HOLD THE LINE FROM OUTSIDE THE HOLE . THE ROPE SHALL BE <br /> HALF WRAPPED AROUND THE WAIST ALLOWING FOR PROPER ROPE <br /> TENSION AND THE END FASTENED TO A STATIONERY OBJECT. <br /> 8. JUMPING TO AND FROM TANKS IS NOT PERMITTED. WALKING <br /> PLANKS SHALL BE SET FROM EACH TANK TOP TO THE NEXT AND <br /> ONE FROM THE BANK TO THE CLOSEST TANK. EACH PLANK SHALL <br /> ALTERNATE FROM ONE END OF THE TANKS TO THE OTHER. THEY <br /> SHALL BE AT LEAST 2" THICK AND CUT TO SIZE AS TO <br /> ACCOMMODATE 8"-12" PAST THE POINT OF CONTACT ON BOTH <br /> ENDS. THEY SHALL HAVE A PROTECTIVE LAYER OF RUBBER OR <br /> EQUIVALENT TO PREVENT SLIPPING AND DAMAGE TO THE TANK <br /> SURFACE. <br /> 9 . IT IS MORE DESIRABLE TO ELIMINATE PUTTING WORKERS ON A <br /> TANK. THEREFORE, OPEN-END LIFTING HOOKS OR "S" HOOKS <br /> SHALL BE LSED FOR LIFTING TANKS WHENEVER POSSIBLE . ROPE <br /> GUIDES CAN BE TIED TO THE HOOKS TO BE PULLED OUT OR <br /> GUIDED IN FROM OUTSIDE THE TANK HOLE. IF HOOKS HAVE <br /> SAFETY LATCHES, PROD OPEN WITH AN EXTENSION POLE FROM <br /> OUTSIDE THE EXCAVATION. <br /> 10 . A LEVEL CAN BE ATTACHED TO AN EXTENSION POLE AND LOWERED <br /> TO THE TANK TOP FROM THE OUTSIDE BANK. <br />
The URL can be used to link to this page
Your browser does not support the video tag.