My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:39:03 PM
Creation date
11/5/2018 11:33:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v � <br /> 11. WHILE A TANK IS RESTING ON THE TRANSPORTING VEHICLE, <br /> LIFTING HOOKS SHALL BE REMOVED/ATTACHED BY GAINING ACCESS <br /> WITH AN EXTENSION LADDER. WALKING THE LENGTH OF THE TANK <br /> IS STRICTLY FORBIDDEN. TANKS TO BE UNLOADED SHALL NOT BE <br /> UNSECURED UNTIL LIFTING HOOKS ARE ATTACHED AND THE <br /> OPERATOR IS READY TO GO. <br /> 12 . RIDING THE EQUIPMENT BUCKET FOR ANY REASON IS ONLY <br /> ALLOWED WHEN THE RIDER IS WEARING A SAFETY HARNESS THAT <br /> IS CLIPPED TO THE BUCKET. <br /> 13. AT LEAST TWO FIRE EXTINGUISHERS (60 BC) MUST BE EASILY <br /> ACCESSIBLE ON SITE DURING A TANK REMOVAL UNLESS THAT <br /> PARTICULAR CITY OR COUNTY REQUIRES MORE. <br /> 14 . HEAVY EQUIPMENT SHALL NOT BE RUN INSIDE AN UNPROTECTED <br /> EXCAVATION UNLESS THE OPERATOR IS COMPLETELY PROTECTED BY <br /> CAB. DETACHABLE WEBBING CAN BE PLACED OVER THE OPEN <br /> AREAS. THE OPERATOR MUST ALSO WEAR A FULL BODY SAFETY <br /> HARNESS WITH A LANYARD AND NYLON LINE EXTENDING OUTSIDE <br /> THE EXCAVATION AND CARRY A 5-MINUTE BREATHING AIR BOTTLE <br /> IN THE CAB FOR EMERGENCY RESCUE PURPOSES . IN CASE OF <br /> EQUIPMENT FAILURE OR A CAVE-IN DISABLING THE EQUIPMENT, <br /> THE OPERATOR SHOULD NOT EXIT THE CAB UNTIL THE EXIT <br /> PROCEDURE HAS BEEN DETERMINED. EVACUATION SHALL COMPRISE <br /> OF RIDING A BUCKET TO THE SURFACE (WITH HARNESS) OR <br /> WALKING OUT, ONLY IF A 1 TO 1 SLOPE CAVE IN WOULD NOT <br /> REACH THE WALKING AREA AND THE EXIT WALL IS SLOPED OR <br /> RAMPED. AT LEAST TWO OTHER WORKERS SHALL BE ON SITE <br /> DURING ALL BELOW-GRADE ACTIVITIES. <br /> 15. IF THE LAY-OUT OF A JOB-SITE WILL NOT ALLOW FOR THE USE <br /> OF THESE SAFETY PROCEDURES, THE SAFETY ENGINEER SHALL BE <br /> CONSULTED ON ALTERNATIVE METHODS. <br /> 16. HARD HATS, WORK SHOES, AND SAFETY GLASSES ARE REQUIRED. <br /> 17 . SITE HISTORY INFORMATION AND MONITORING SHALL BE OF HIGH <br /> PRIORITY IN DETERMINING ADDITIONAL PERSONAL PROTECTIVE <br /> EQUIPMENT (PPE) AND RESPIRATORY PROTECTION. <br /> 18 . THESE PROCEDURES ARE TO BE USED =N CONJUNCTION WITH THE <br /> COMPANY "CODE OF SAFE PRACTICES" . <br /> REVISED 8/03/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.