My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 11:50:32 AM
Creation date
11/5/2018 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Califomia Edition: September 1997 <br />Marley Pump Co. <br />Red Jacket PPM 4000, RLM 9000, RLM 10000, ST 1401L, and ST1801 L �- G/p7' <br />Certification: <br />Leak Threshold: <br />Applicability: <br />Specification: <br />Pipeline Capacity: <br />Waiting Time: <br />Test Period: <br />AUTOMATIC ELECTRONIC LINE LEAK DETECTOR <br />Leak rate of 3.0 gph with Po=100% and PFA=O%. <br />2.0 gph. A leak is declared if the output of the measurement system <br />equals or exceeds this threshold. <br />Gasoline, diesel, aviation fuel and solvents. <br />System tests pressurized fiberglass and steel pipelines. <br />Tests are conducted at 5-10 psi. <br />Maximum of 55.1 gallons. <br />None between delivery and testing. <br />None between dispensing and testing. <br />Response time is 1 minute. <br />Test data are acquired and recorded by a microprocessor. <br />Calculations are automatically performed by the microprocessor. <br />System Features: Permanent installation on pipeline. <br />Automatic testing of pipeline. <br />Preset threshold. <br />Single test to determine if pipeline is leaking. <br />Recording and display of day, date, and time of positive test. <br />Dispenser shutdown, message display, and alarm activation if leak is declared. <br />Calibration: System must be checked annually and calibrated if necessary in accordance with <br />manufacturer's instructions. <br />[> %/-/lS /S A x? 16, /PZ/N7' <br />c,14L1F pV47-6,e >" 6f11q ,4 fS 1 <br />len <br />51�e-7c "Al i 7 - <br />Marley Pump Co. <br />5800 Foxridge Dr. <br />Mission, KS 66202 <br />Tel: (913) 813-5700 <br />Evaluator: Ken Wilcox Associates <br />Tel: (816) 443-2494 <br />Date of Evaluation: 03/11/91, Rev. 04/94 <br />157 <br />Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of <br />the method or equipment. Equipment should be installed and operated in accordance with all applicable laws and regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.