Laserfiche WebLink
04/26/1999 07:11 <br />• <br />7146705420 <br />EHS ARCO LA PALMA <br />Contact ARCO Maintenance or its designated agent by using <br />the telephone number previously provided— <br />B. <br />rovided <br />B. Tag the dispenser "out of order" until the liquid has been <br />removed by authorized persons. <br />ARCO RESPONSIMLMES <br />Method of removing an unauthorized release from the spill <br />containment device: <br />A. Any unauthorized release into the containment box will be <br />removed by ARCO in accordance with California Health and <br />Safety. Code requirements. In the event of an emergency, a <br />pumping contractor or truck will be available immediately. in <br />all other cases, equipment availability will be within 12 hours. <br />B. ARCO Maintenance will be responsible for authorizing and <br />selecting contractors for the work to be performed. <br />S. TRAINING <br />All employees must be trained In the subject mentioned in Sections 3 <br />and 4 above. Training needed for the operation of the dispenser <br />containment devices shall inci.ude how to inspect the equipment and <br />to manually close -he dispenser impact valve. <br />cAsroscmcc "4 <br />r <br />PAGE 14 <br />A. <br />7146705420 <br />EHS ARCO LA PALMA <br />Contact ARCO Maintenance or its designated agent by using <br />the telephone number previously provided— <br />B. <br />rovided <br />B. Tag the dispenser "out of order" until the liquid has been <br />removed by authorized persons. <br />ARCO RESPONSIMLMES <br />Method of removing an unauthorized release from the spill <br />containment device: <br />A. Any unauthorized release into the containment box will be <br />removed by ARCO in accordance with California Health and <br />Safety. Code requirements. In the event of an emergency, a <br />pumping contractor or truck will be available immediately. in <br />all other cases, equipment availability will be within 12 hours. <br />B. ARCO Maintenance will be responsible for authorizing and <br />selecting contractors for the work to be performed. <br />S. TRAINING <br />All employees must be trained In the subject mentioned in Sections 3 <br />and 4 above. Training needed for the operation of the dispenser <br />containment devices shall inci.ude how to inspect the equipment and <br />to manually close -he dispenser impact valve. <br />cAsroscmcc "4 <br />r <br />PAGE 14 <br />