My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 11:50:32 AM
Creation date
11/5/2018 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/26/1999 07:11 <br />• <br />7146705420 <br />EHS ARCO LA PALMA <br />Contact ARCO Maintenance or its designated agent by using <br />the telephone number previously provided— <br />B. <br />rovided <br />B. Tag the dispenser "out of order" until the liquid has been <br />removed by authorized persons. <br />ARCO RESPONSIMLMES <br />Method of removing an unauthorized release from the spill <br />containment device: <br />A. Any unauthorized release into the containment box will be <br />removed by ARCO in accordance with California Health and <br />Safety. Code requirements. In the event of an emergency, a <br />pumping contractor or truck will be available immediately. in <br />all other cases, equipment availability will be within 12 hours. <br />B. ARCO Maintenance will be responsible for authorizing and <br />selecting contractors for the work to be performed. <br />S. TRAINING <br />All employees must be trained In the subject mentioned in Sections 3 <br />and 4 above. Training needed for the operation of the dispenser <br />containment devices shall inci.ude how to inspect the equipment and <br />to manually close -he dispenser impact valve. <br />cAsroscmcc "4 <br />r <br />PAGE 14 <br />A. <br />7146705420 <br />EHS ARCO LA PALMA <br />Contact ARCO Maintenance or its designated agent by using <br />the telephone number previously provided— <br />B. <br />rovided <br />B. Tag the dispenser "out of order" until the liquid has been <br />removed by authorized persons. <br />ARCO RESPONSIMLMES <br />Method of removing an unauthorized release from the spill <br />containment device: <br />A. Any unauthorized release into the containment box will be <br />removed by ARCO in accordance with California Health and <br />Safety. Code requirements. In the event of an emergency, a <br />pumping contractor or truck will be available immediately. in <br />all other cases, equipment availability will be within 12 hours. <br />B. ARCO Maintenance will be responsible for authorizing and <br />selecting contractors for the work to be performed. <br />S. TRAINING <br />All employees must be trained In the subject mentioned in Sections 3 <br />and 4 above. Training needed for the operation of the dispenser <br />containment devices shall inci.ude how to inspect the equipment and <br />to manually close -he dispenser impact valve. <br />cAsroscmcc "4 <br />r <br />PAGE 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.