Laserfiche WebLink
REQUIRED DEADMAN DIMENSIONS <br />TANK <br />DEADMAN <br />DEADMAN <br />DEADMAN <br />TANK SIZE <br />LENGTH <br />LENGTH <br />HEIGHT <br />WIDTH <br />'A' <br />B' <br />C' <br />D' <br />8 FT. DIA. <br />10,000 <br />27'-6" <br />28'-6" <br />18" <br />12" <br />GALLON <br />ALL MANHOLE ACCESS COVERS 14 15 16 <br />TO BELOW GRADE SHALL BE <br />LIQUID TIGHT AND LOCKABLE <br />(TYP.) <br />h <br />A.C. PAVING <br />6" CONCRETE TANK SLAB <br />1 1/2" -1_1/2" W/ 6X6/#4/4 WWM <br />(TYP. ALL) 12 /. 18 (TYR, ALL) f- 18" / 18 _- <br />_-_- r -:y ) A.C. PAVING <br />() �(( 1 <br />(TYP) (TYP) (TYP. 12 <br />a4 <br />3 PEA GRAVEL MIN. =•, r\�/j\/ <br />' - #3 TOP & BOTTOM <br />�j �' AROUND ALL PENETRATIONS (TYP.) <br />r <br />Z <br />NOTE. <br />ALL MANHOLES ON THE TANK SLAB SHALL BE INSTALLED WITH A 1-1/2" CROWN OF CONCRETE <br />TO PREVENT WATER INTRUSION INTO THE MANHOLE, THE OWNER'S ENGINEER WILL BE REQUIRED <br />TO SIGN OFF ON THIS ITEM ON THE TANK INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE <br />PAID. CONTRACTOR WILL BE REQUIRED TO REINSTALL ENTIRE DRIVE SLAB AT OWN EXPENSE IF <br />THIS DESIGN REQUIREMENT IS NOT MET, <br />Typical Slab at Tanks <br />NOT TQ SCALE <br />Tank Slab Concrete Specifications <br />1. UNLESS OTHERWISE NOTED ON THESE DRAWINGS: 4. REINFORCING STEEL FOR TANK SLABS SHALL BE 6 x 6 - 4/4 WWM WELDED WIRE FABRIC <br />o. CONCRETE - REGULAR WEIGHT HARD ROCK CONCRETE (150 LBS/CU FT) OR #3 BARS (9) 16 O.C. EACH WAY. SUMP CAGES SHALL BE #3 REBAR TOP AND BOTTOM. <br />b. CEMENT - TYPE II, SULFATE RESISTANT 5. MAINTAIN CONCRETE IN A MOIST CONDITION FOR AT LEAST 7 DAYS AFTER PLACEMENT. <br />c. AGGREGATES - ASTM C33, (MAXIMUM SIZE 3/4 INCHES) <br />d. 28 DAY CONCRETE STRENGTH (Cc): 6. PLACE CONCRETE DIRECTLY FROM TRUCK INTO FORMS. DO NOT PUMP CONCRETE UNLESS <br />3,000 PSI - SLAB (DESIGN BASED ON 2,000 PSI NO SPECIAL INSPECTION REQUIRED) SPECIAL INSPECTION, IN ACCORDANCE WITH CHAPTER 3 OF THE UBC, IS PROVIDED. <br />e. SLUMP -- 3"+ 1" - 4" MAXIMUM AT POINT OF PLACEMENT 7. SUBMIT MIX DESIGNS, WITH STRENGTH AND SHRINKAGE TEST RESULTS, TO OWNER'S ENGINEER <br />f, SHRINKAGE - 0.05% MAXIMUM AT LEAST 7 DAYS BEFORE PLACING CONCRETE. <br />2. CONCRETE SLAB THICKNESS SHALL BE A MINIMUM OF 6.0 INCHES 8. CONSOLIDATE CONCRETE IN PLACE USING A MECHANICAL VIBRATOR, <br />(UNLESS OTHERWISE NOTED ON THESE DRAWINGS) <br />3, CONCRETE SHALL BE NORMAL WEIGHT WITH A MIX OF 1 : 2 1/2 3 1/2, WITH A MAXIMUM 9. BEFORE PLACING CONCRETE, SECURE REINFORCING STEEL, ANCHOR BOLTS, DOWELS, AND <br />7 1/2 GALLONS OF WATER PER SACK, OTHER INSERTS IN POSITION TO PREVENT MOVEMENT. <br />10. MATERIALS AND WORKMANSHIP SHALT_ CONFORM TO A.I.C. - 318 (SPECIFICATIONS OF THE <br />DESIGN AND PLACEMENT OF CONCRETE). <br />IN UNSTABLE (AS DEFINED BY SOILS <br />REPORT) SOIL THE DIMENSION <br />\ MUST BE 4 FT. FROM BOTH SIDES `/` 3" <br />'FORTH LIFT OF PEA GRAVEL <br />1 AND ENDS (WITH FIBERGLASS TANKS) ` ,MIN. TO TOP OF TANK <br />ys f <br />� NOTE: <br />ARCO CONSTRUCTION PAINT COVER BLACK. <br />12"K THIRD LIFT OF PEA GRAVEL ARCO CONSTRUCTION WILL TAG EACH FILL <br />?�?\r ` } 12SECOND LIFT OF PEA GRAVEL \ RISER WITH THE PROPER PRODUCT I.E. TAG. <br />NOTES: DISTRIBUTION IS RESPONSIBLE FOR IDENTIFYING <br />�I w����� 12' FIRST LIFT OF PEA GRAVEL <br />x �> __..__z/ `r r� THE TANKS WITH A.P.I. COLORS. <br />(1) ALL UIREMENTS.ANCHORING SHALL BE DONE IN ACCORDANCE W / MANUFACTURER'S/8 P A GRAVEL BEDDING FILL PORT <br />�3NILL TYPICAL TO I <br />(2) FILTER FABRIC (DUPONT STALL TYNE. OR MIIC ST X) IS REQUIRED FILTER FABRIC ON BOTTOM SUB GRADE SURFACE BRASS I.D. TAG BY ARCO DISTRIBUTION <br />FOR WET HOLE INSTALLATIONS. FABRIC MUST EXTEND 1 ABOVE MAX. (BOTTOM E SURFACE <br />HIGH WATER TABLE AND MAY BE PINNED TO SIDE OF HOLE WITH WIRE, OF TANK HOLE STAGE I VAPOR RECOVERY - <br />ETC. <br />Hr""'N' <br />ETC. SEAMS MUST BE LAPPED 1' MINIMUM. T \1. 1 <br />m (3) TANK MOST BE BALLASTED BY FILLING WITH WATER UNTIL BACKFILL L1 <br />r v <br />a' COMPLETE CAUTION DO NOT FILL FIBERGLASS TANK WITH i <br />a LIQUID UNTIL BACKFILL IS EVEN WITH TOP. SEE SPECIFICATIONS T pical Anchoring for / 4"x4" HIGHWAY REFLECTOR MARKER FOR <br />\ WHEN INSTALLATION IS COMPLETED, WATER IS TO BE COMPLETELY QQ1 n PRODUCT IDENTIFICATION. COLORED <br />\M PUMPED OUT & MOPPED DRY TO PROTECT FUEL INTEGRITY. 0 Q o Diameter Tanks 'I INSTALLED BY CONTRACTOR <br />PER API STANDARDS. MOUNTED <br />w <br />O B <br />¢ 4 DEADMEN TO BE INSTALLED IN A WET HOLE OR WHEN REQUIRED <br />BY OWNERS ENGINEER OR AUTHORITY HAVING JURISDICTION. NOT TO SCALE: i <br />U WHEN REQUIRED, THE ANCHORING SYSTEM SHALL BE IN <br />COMPLIANCE WITH AUTHORITY HAVING JURISDICTION. <br />Q_ <br />Q (5) WHEN GROUNDWATER LEVEL IS ANTICIPATED TO BE WITHIN 5 FT. TYFICAI TANK <br />OF GRADE CONTRACTOR SHALL NOTIFY OWNER'S ENGINEER I O , <br />FOR DIRECTION ON ANCHORING METHOD TO BE USED. (DEADMAN <br />OR ANCHORING SLAB) ext �- <br />Q �� `— STANDARD DETAIL FOR 10" 12" <br />Z (6) WHEN ENGINEERED SHORING IS REQUIRED DUE TO SITE ^ OR 14" ACCESS COVERS. NO <br />CONDITIONS AND ENGINEERED SHORING PLAN UTILIZING �O <br />INTERLOCKING STEEL SHEET PILING SHALL BE PROVIDED AND OTHER MARKINGS ARE PERMITTED, <br />¢ SHALL INCLUDE SUPPORTING ENGINEERING CALCULATIONS BY 3 1/4" / \ L>Z •' <br />D ENGINEER. / / l 7 API STANDARD COLORS <br />_ _ / n� UNLEADED PREMIUM 92 OCTANE - RED <br />U � A STATE CERTIFIED <br />01 <br />w / <br />w ` Y, <br />FRP HOLD DOWN— ! UNLEADED 87 OCTANE - WHITE <br />G_ m' STRAPS W/ GUIDES.\{\ 1 3/8" 1 <br />BY TANK MFG. ", UNLEADED PLUS 89 OCTANE (NOT USED) - BLUE <br />Lr +� ) DIESEL (NOT USED) - GREEN <br />WIRE ROPE Q ;\ �L Access Cover Identification <br />,n <br />TURNBUCKLE— d <br />TURNBUCKLE 1 <br />1. <br />CABLE CLAMPS �1 � ix v L3JL>[, <br />WIRE ROPE —_ (TYP.)`' Mold down Strap <br />kk i RE„�, ",` ��� Standard Two Point Fill <br />CABLE CLAMPS 4SIN�LE DEADMAN \) "/ DOUBLE DEADMAN <br />YP f r End Detail L <br />o ,G,; ,.' G,''VDT TO SC ALE. <br />it ( ) NOT TO SCALE: -- <br />o w I / Z <br />- <br />I MN -0 <br />REBAR AT EA CORNER / <br />/ TIES AT 16' 0 C I,) E%AIE PI di`, r� I i I _ <br />z \ �Di( �4�X.c2i HOL#3 D REBAR L5' CLEAR OF `\ /4/99 ADDED NEW 10,000 GALLON TANK PER ARCO <br />C SEE CHART FOR DEADMAN FORMED SURFACES. (TYP.) �j 2/10/99 <br />7 DIMENSIONS <br />Deadman_ Detail Typical Tank Anchoring 2/10/99 <br />z 3 <br />NOT TO SCALE and Connections <br />w NOT TO SCALE jI <br />G0)OO <br />C�(( a .0 .� O <br />{y 0 (ll 0 L <br />O <br />E d1 '0 <br />O W a� <br />0a-pa� <br />�? a C Uiv <br />V CO C <br />(0 <br />Q Q O <br />CL r) <br />N <br />® C � <br />0 Orn <br />©C_ U <br />Q� E <br />nro <br />W <br />J <br />L <br />0 <br />♦. • E <br />U Cu <br />cd P Z <br />LL Q <br />L 0) 0) <br />E 0 <br />0 CSS . <br />L <br />(� @ Q O <br />nsU - ate, <br />� C W cd <br />-p m p <br />(0 00 <br />X 0 0 Co 0 <br />W C\j C()' <br />�OHA(j <br />I � U <br />0 <br />s <br />G�F7NQENG\t4 x- <br />PC' <br />'LAND PIANNMG AND DESIGN SPECAUSTS' <br />18215 72ND AVENUE SOUTH <br />KENT, WASHINGTON 98032 <br />(425) 251-6222 <br />BCE# 4009 <br />3/4/9$ <br />1/30/99 SHK <br />2133 <br />TK3-5 <br />ASPHALT TANK SLAB <br />FILTER FABRIC <br />SEE NOTE #2 <br />SLOPE EXCAVATION 1 1/2 <br />1 .- <br />OR PER SOILS REPORT <br />RECOMMENDATION <br />IN UNSTABLE (AS DEFINED BY SOILS <br />REPORT) SOIL THE DIMENSION <br />\ MUST BE 4 FT. FROM BOTH SIDES `/` 3" <br />'FORTH LIFT OF PEA GRAVEL <br />1 AND ENDS (WITH FIBERGLASS TANKS) ` ,MIN. TO TOP OF TANK <br />ys f <br />� NOTE: <br />ARCO CONSTRUCTION PAINT COVER BLACK. <br />12"K THIRD LIFT OF PEA GRAVEL ARCO CONSTRUCTION WILL TAG EACH FILL <br />?�?\r ` } 12SECOND LIFT OF PEA GRAVEL \ RISER WITH THE PROPER PRODUCT I.E. TAG. <br />NOTES: DISTRIBUTION IS RESPONSIBLE FOR IDENTIFYING <br />�I w����� 12' FIRST LIFT OF PEA GRAVEL <br />x �> __..__z/ `r r� THE TANKS WITH A.P.I. COLORS. <br />(1) ALL UIREMENTS.ANCHORING SHALL BE DONE IN ACCORDANCE W / MANUFACTURER'S/8 P A GRAVEL BEDDING FILL PORT <br />�3NILL TYPICAL TO I <br />(2) FILTER FABRIC (DUPONT STALL TYNE. OR MIIC ST X) IS REQUIRED FILTER FABRIC ON BOTTOM SUB GRADE SURFACE BRASS I.D. TAG BY ARCO DISTRIBUTION <br />FOR WET HOLE INSTALLATIONS. FABRIC MUST EXTEND 1 ABOVE MAX. (BOTTOM E SURFACE <br />HIGH WATER TABLE AND MAY BE PINNED TO SIDE OF HOLE WITH WIRE, OF TANK HOLE STAGE I VAPOR RECOVERY - <br />ETC. <br />Hr""'N' <br />ETC. SEAMS MUST BE LAPPED 1' MINIMUM. T \1. 1 <br />m (3) TANK MOST BE BALLASTED BY FILLING WITH WATER UNTIL BACKFILL L1 <br />r v <br />a' COMPLETE CAUTION DO NOT FILL FIBERGLASS TANK WITH i <br />a LIQUID UNTIL BACKFILL IS EVEN WITH TOP. SEE SPECIFICATIONS T pical Anchoring for / 4"x4" HIGHWAY REFLECTOR MARKER FOR <br />\ WHEN INSTALLATION IS COMPLETED, WATER IS TO BE COMPLETELY QQ1 n PRODUCT IDENTIFICATION. COLORED <br />\M PUMPED OUT & MOPPED DRY TO PROTECT FUEL INTEGRITY. 0 Q o Diameter Tanks 'I INSTALLED BY CONTRACTOR <br />PER API STANDARDS. MOUNTED <br />w <br />O B <br />¢ 4 DEADMEN TO BE INSTALLED IN A WET HOLE OR WHEN REQUIRED <br />BY OWNERS ENGINEER OR AUTHORITY HAVING JURISDICTION. NOT TO SCALE: i <br />U WHEN REQUIRED, THE ANCHORING SYSTEM SHALL BE IN <br />COMPLIANCE WITH AUTHORITY HAVING JURISDICTION. <br />Q_ <br />Q (5) WHEN GROUNDWATER LEVEL IS ANTICIPATED TO BE WITHIN 5 FT. TYFICAI TANK <br />OF GRADE CONTRACTOR SHALL NOTIFY OWNER'S ENGINEER I O , <br />FOR DIRECTION ON ANCHORING METHOD TO BE USED. (DEADMAN <br />OR ANCHORING SLAB) ext �- <br />Q �� `— STANDARD DETAIL FOR 10" 12" <br />Z (6) WHEN ENGINEERED SHORING IS REQUIRED DUE TO SITE ^ OR 14" ACCESS COVERS. NO <br />CONDITIONS AND ENGINEERED SHORING PLAN UTILIZING �O <br />INTERLOCKING STEEL SHEET PILING SHALL BE PROVIDED AND OTHER MARKINGS ARE PERMITTED, <br />¢ SHALL INCLUDE SUPPORTING ENGINEERING CALCULATIONS BY 3 1/4" / \ L>Z •' <br />D ENGINEER. / / l 7 API STANDARD COLORS <br />_ _ / n� UNLEADED PREMIUM 92 OCTANE - RED <br />U � A STATE CERTIFIED <br />01 <br />w / <br />w ` Y, <br />FRP HOLD DOWN— ! UNLEADED 87 OCTANE - WHITE <br />G_ m' STRAPS W/ GUIDES.\{\ 1 3/8" 1 <br />BY TANK MFG. ", UNLEADED PLUS 89 OCTANE (NOT USED) - BLUE <br />Lr +� ) DIESEL (NOT USED) - GREEN <br />WIRE ROPE Q ;\ �L Access Cover Identification <br />,n <br />TURNBUCKLE— d <br />TURNBUCKLE 1 <br />1. <br />CABLE CLAMPS �1 � ix v L3JL>[, <br />WIRE ROPE —_ (TYP.)`' Mold down Strap <br />kk i RE„�, ",` ��� Standard Two Point Fill <br />CABLE CLAMPS 4SIN�LE DEADMAN \) "/ DOUBLE DEADMAN <br />YP f r End Detail L <br />o ,G,; ,.' G,''VDT TO SC ALE. <br />it ( ) NOT TO SCALE: -- <br />o w I / Z <br />- <br />I MN -0 <br />REBAR AT EA CORNER / <br />/ TIES AT 16' 0 C I,) E%AIE PI di`, r� I i I _ <br />z \ �Di( �4�X.c2i HOL#3 D REBAR L5' CLEAR OF `\ /4/99 ADDED NEW 10,000 GALLON TANK PER ARCO <br />C SEE CHART FOR DEADMAN FORMED SURFACES. (TYP.) �j 2/10/99 <br />7 DIMENSIONS <br />Deadman_ Detail Typical Tank Anchoring 2/10/99 <br />z 3 <br />NOT TO SCALE and Connections <br />w NOT TO SCALE jI <br />G0)OO <br />C�(( a .0 .� O <br />{y 0 (ll 0 L <br />O <br />E d1 '0 <br />O W a� <br />0a-pa� <br />�? a C Uiv <br />V CO C <br />(0 <br />Q Q O <br />CL r) <br />N <br />® C � <br />0 Orn <br />©C_ U <br />Q� E <br />nro <br />W <br />J <br />L <br />0 <br />♦. • E <br />U Cu <br />cd P Z <br />LL Q <br />L 0) 0) <br />E 0 <br />0 CSS . <br />L <br />(� @ Q O <br />nsU - ate, <br />� C W cd <br />-p m p <br />(0 00 <br />X 0 0 Co 0 <br />W C\j C()' <br />�OHA(j <br />I � U <br />0 <br />s <br />G�F7NQENG\t4 x- <br />PC' <br />'LAND PIANNMG AND DESIGN SPECAUSTS' <br />18215 72ND AVENUE SOUTH <br />KENT, WASHINGTON 98032 <br />(425) 251-6222 <br />BCE# 4009 <br />3/4/9$ <br />1/30/99 SHK <br />2133 <br />TK3-5 <br />