Laserfiche WebLink
`� <br />R. Jeff Granberry / Jeff Byram <br />Page 2 <br />If no hearing is requested within the public comment period, you <br />will be notified that the Corrective Action Plan will be allowed <br />to proceed. I anticipate a public comment period of 10 to 14 <br />days, but I will let you know once I determine the potential <br />impact your plan may have. <br />Please submit three original documents of the Corrective Action <br />Plan along with three originals of an Executive Summary. This <br />summary is a non-technical, single page document intended to be <br />reviewed by the general public so that they may get a quick <br />overview of what has happened on the site since its beginning, <br />its current status, what you are proposing, and the final status <br />of the site. It has been my experience that a clearly and <br />concisely written Executive Summary has eliminated the public's <br />concern and any need for a hearing. <br />Any member of the public that requires a more detailed <br />description of the proposed Corrective Action will be directed to <br />the public library or PHS-EHD so that they may review one of the <br />three original Corrective Action Plans you have submitted. <br />I realize this may be somewhat overwhelming now, but without this <br />process no removal of impacted soil can occur during the tank <br />removal. This procedure will allow you the opportunity to <br />quickly remediate any secondary source of contamination found at <br />the tank removal. But it should be noted that over -excavation is <br />not required and by leaving petroleum impacted soils in place may <br />require further remediation/investigation later as directed by <br />PHS-EHD. <br />You may contact Michael Infurna at (209) 468-3454 should you have <br />any questions or to make an appointment to witness your field <br />activities. <br />Donna Heran, REHS, Director <br />EnvirongLeptal Division <br />Michael Infurna, Senior REHS <br />Site Mitigation Unit <br />Diane M. Hinson, REHS <br />Supervisor <br />C, Tom Piskor - A & S Engineering <br />45 Quail Court #303 <br />Walnut Creek, 94596 <br />/C.- Jerry Yoshioka - PHS-EHD/Unit III, Stockton <br />