My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BOURBON
>
1413
>
2300 - Underground Storage Tank Program
>
PR0231869
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:55 AM
Creation date
11/5/2018 12:13:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0231869
PE
2361
FACILITY_ID
FA0003958
FACILITY_NAME
AT&T California - UE694
STREET_NUMBER
1413
STREET_NAME
BOURBON
STREET_TYPE
St
City
Stockton
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
1413 Bourbon St
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BOURBON\1413\PR0231869\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. INTRODUCTION <br /> a. Purpose <br /> The primary purpose of this Site Health and Safety Plan is to provide Fuller Excavating & Demolition field <br /> personnel with an understanding of the potential chemical and physical hazards that exist or may arise while the <br /> tasks of this tank removal project are being performed. Secondarily,this information defines the safety precautions <br /> necessary to respond to such hazards. <br /> A copy of this site health and safety plan will be on site at all times. An additional copy will be kept and <br /> transported along with any injured worker to the medical facility for use by medical staff. <br /> b. Objective <br /> The objective of this health and safety plan is to ensure the safety of all field personnel, and the surrounding <br /> community. Accordingly, all personnel assigned to this project will read and sign the acknowledged statement at <br /> the end of this plan,to certify that they have read, understand and will abide by the health and safety plan. <br /> c. Tailgate Meetings <br /> A tailgate meeting will be conducted by the job superintendent/site safety officer.No work will be <br /> performed before this meeting has taken place. The tailgate meeting will be conducted prior to each days <br /> activities to review the following: <br /> -location of the health and safety supplies on-site <br /> -location of nearby telephones <br /> -emergency procedures <br /> -review procedures for working around heavy equipment <br /> -establish exclusion zone <br /> Any personnel who may need to enter an exclusion or contamination zone must have completed an OSHA 40 <br /> hour hazardous waste operations training. All visitors must check in with the site safety officer. <br /> D-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.