My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BUCKLEY COVE
>
4950
>
2300 - Underground Storage Tank Program
>
PR0231028
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 9:02:51 AM
Creation date
11/5/2018 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231028
PE
2361
FACILITY_ID
FA0003811
FACILITY_NAME
RIVER POINT LANDING MARINA-RESORT*
STREET_NUMBER
4950
STREET_NAME
BUCKLEY COVE
STREET_TYPE
WAY
City
STOCKTON
Zip
95219
APN
11820001
CURRENT_STATUS
01
SITE_LOCATION
4950 BUCKLEY COVE WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BUCKLEY COVE\4950\PR0231028\BILLING 1987 - 2005.PDF
QuestysFileName
BILLING 1987 - 2005
QuestysRecordDate
12/11/2017 11:11:29 PM
QuestysRecordID
3745759
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN Pae 1 of 2 <br /> TYPE OF ACTION Q 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> PLAN TYPE Q '1 ONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agencv Use Only) 1-- _ 2 <br /> J <br /> 161 ) <br /> B INESS NAME(Same as Facility Name or DBA) <br /> P371 <br /> Ar r T <br /> B'U ESS SITE DRESS CITY <br /> © �► <br /> II" QUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> Ay _cguip"w"t manufaeturm,m3buctians or annually,whichever is more frequent.Such work must be ©rmed qua_l ti d personnel.Iz3 CCR§2632.2634,263s.264 11 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY [399.OTHER(Specify): 490 b <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632.26341 axia <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (h heaekau <br /> CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) $ <br /> WITH AUDIBLE AND VISUAL ALARMS.lz3 ecR§265x,26341 <br /> SECONDARY CONTAINMENT IS: 62 a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSUMED ❑ d.UNDER VACUUM 4`°0-6 <br /> PANEL MANUFACTURER: 4j 490-7. MODEL#: �]�pS 49(" <br /> LEAK SENSOR MANUFACTURER: 490-9. MODEL#(S): j -72 ° 10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED O MONITOR SINGLE WALL TANK(S).123 CCR§26431 490-11 <br /> PANEL MANUFACTURER: 490-12' MODEL#: 490.13 <br /> [N-TANK PROBE MANUFACTURER: 490.14. MODEL#(S): 49°-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c,WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 49047 <br /> PROGRAMMED TESTS: a_0.l h. b.0.2 h. c.OTHERS i 419 _ <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR 42646-11 490 o_ <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 crit§26451 TESTING PERIOD: ❑ &36 HOURS ❑ b.60 HOURS49490 21. <br /> o-za <br /> ❑ 5,TANK INTEGRITY TESTING PER 123 ceR§2643.11 <br /> 490-23_ <br /> TEST FREQUENCY: [3a.ANNUALLY ❑ b.BIENNIALLY e.OTHER(Speclf): 4902524 <br /> 49u-26. <br /> 99.OTHER(Specify): 490 2V <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Cheekrrli <br /> Ghat a Iv <br /> CONTINUOUS MONITORING OF PIPE/PI PING UMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 41x28 <br /> I23 CcR SECONDARY CONTAINMENT IS: a.DRY [3b.LIQUID FILLED (3c.PRESSURIZED ❑ d.UNDER VACUUM 490'29. <br /> §2636] <br /> PANEL MANUFACTURER: 49&-3{1. MODEL#: X -146 °90.31. <br /> LEAK SENSOR MANUFACTURER: VQ" <br /> _ AXJ 49&-32. MODEL#(S): � 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. (3a.YES b NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a_YES &b.No 490-35. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490,14 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED[23 CCR§26361 i1 <br /> MLLD MANUFACTURER(S):. F'7'rQ 410-33. MODEL#(S): �-` W 49-A <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23cCR§26361 ,19039. <br /> ELLD MANUFACTURER(S): ' 490-40. MODEL#(S): 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑a.MINIMUM MONTHLY 0.2 g.p.h, ❑ b.MINIMUM ANNUAL 0.1 g,p.h. 490142 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490.43. <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. 13 &YES ❑ b.No 490-44 <br /> -Cr4.PIPE INTEGRITY TESTING. 490-43. <br /> 046 <br /> TEST FREQUENCY: ANNUALLY 13b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49"7. _ <br /> ❑ 5.VISUAL PIPE MONITORING. 4eu48, <br /> FREQUENCY; ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490 45 <br /> "n11aa ro<,nweu,nay of ub.c ed .s .xeneruor riyspna only rlsc§zszxl.stnx3t <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.123 CCR§26Wax31[ 490.50, <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-5 1. <br /> 49052 <br /> 99.OTHER(Specify) 53. <br /> UPCF UST-D(12/2007)-114 www.usidoes.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.