Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Pae 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING (Check all <br /> that applig <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWPNG METHOD(S) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING 9 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54* <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 4W54'b <br /> LEAK MONITOR MANUFACTURER: 490-55' MODEL if: 490.96 <br /> LEAK SENSOR MANUFACTURER: 49M7. MODEL tl(S): 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES 2'G,NO 49064` <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES [!b.NO 49"' <br /> UDC MONITORING STOPS THE FLOW OVODUCT AT THE DISPENSER. E7'a.YES ❑ b.NO 490-62 <br /> UDC CONSTRUCTION IS: 1.SINGLE WALL <br /> _DOUBLE WALL 49063. <br /> IF DOUBLE WALL: 490-64A <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE <br /> ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-64b. <br /> VIL PERIODIC SYSTEM TESTING <br /> L ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49065 <br /> LEAK DETECTION MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE UIRED.t23 ccR§2644.1 l <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 4=x)-69 <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ C.TANK INTEGRITY TESTING RESULTS <br /> d.SIR TESTING RESULTS(and supporting documentation records) © e.TANK GAUGING RESULTS(and supporting documentation records) <br /> f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> h_EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 496.694 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 49"9b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490694, <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e, <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49tr69f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490.698. <br /> ❑ OTHER(Specify), 490-69h <br /> 490.691. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490.70 <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST sv_stems annually,and within 30 <br /> days of hire.This training will include.but is not limited to,the following: <br /> Y Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> Y The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan_ <br /> • The facility employee's rode with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> • Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or icate how many pages with additional information on specific monitoring procedures are attached to this plan 4'­71ril 06:1A <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> [Itis an occurs,2. all conditions that indicate a possible release are investi ate Land 3. all monitoring records are maintained,properly. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: t4.[�1r.[94C d C+�a�}i 490-72. TITLE: �G f l�Jl iq'S"CE E' 490-73. <br /> NAME: 490 ta. TITLE: 490-75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator.and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is trite and aecutrate to the best of my knowledge, <br /> APPLICANT SIGNATU DATE: 4990-77 <br /> REPRESENnNG.rl I.Tank Ower/0 ator 2.rac lit (hvned0 ratty t� - 64009 ofO,encr 490.76 �.� / <br /> APPLIC NAME(print): 4W0-79. APPLI ANT TITLE' 490 79. <br /> 7 <br /> UPCF UST-D(12/2007)-3/4 wtrw.unldocs.orq <br />