Laserfiche WebLink
SWRCB,January 2002 Page -� of �] <br /> 5, SECONDARY PIPE TESTING <br /> Test Method Developed By: Yiping Manufacturer E Industry Standard fl Professional Engineer <br /> other(specify) <br /> Test Method Used: ensure - - ❑Vacuum ❑ Hydro=atic <br /> ❑Other(Sped) <br /> Test Equipment Used: (e Ss Lt J� a ujC i vti PST N i vu -�v- Equipment Resolution: 49 — f <br /> Piping Run#'1 Piping Run# iping Run# iping Run# <br /> Piping Material: F rte, l s5 <br /> Piping Manufacturer: ,4y� � eh tX;v-o } <br /> Piping Diameter: 3 `-f �' 1 <br /> Length of Piping Run: YOY. ZZ- <br /> - <br /> Product Stored: yi" u 5 <br /> Method and location of C le,W,S)-,t I T-c c-t— C;(1 51't I/-reL-f- <br /> piping-run <br /> i in -run isolation: 4-u S r1°S,A+. L m'' �I-c..e-1 STpf,., <br /> Wa"Mebetween applying <br /> s ressure acuum/water and <br /> teost: <br /> �� t/ �U� ✓ <br /> Test Start Time: ; 2 1t ; Z!!r' <br /> Initial Reading(R,): S--1= -Y;S <br /> Test End Time: C>% -z-S j = Z- S' <br /> Final Reading(RF): T GJ P5 T <br /> Test Duration: j ,V�,t ✓ 4OL" e <br /> Change in Reading(RF-RO: r .7-. ") <br /> Pass/Fail Threshold or <br /> Criteria: +J O L>ss-i �.\ 0 Loss <br /> Test Result: Pass ❑Fail :'Pass ❑Fail ❑ Pass ❑Fail I ❑ Pass ❑Fail <br /> Comments— include information on repairs made prior to testing, and recommended ollow-u for ailed tests <br />