My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BUCKLEY COVE
>
4950
>
2300 - Underground Storage Tank Program
>
PR0231028
>
COMPLIANCE INFO 2002-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 9:24:49 AM
Creation date
11/5/2018 12:28:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2010
RECORD_ID
PR0231028
PE
2361
FACILITY_ID
FA0003811
FACILITY_NAME
RIVER POINT LANDING MARINA-RESORT*
STREET_NUMBER
4950
STREET_NAME
BUCKLEY COVE
STREET_TYPE
WAY
City
STOCKTON
Zip
95219
APN
11820001
CURRENT_STATUS
01
SITE_LOCATION
4950 BUCKLEY COVE WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BUCKLEY COVE\4950\PR0231028\COMPLIANCE INFO 2002-2010.PDF
QuestysFileName
COMPLIANCE INFO 2002-2010
QuestysRecordDate
12/12/2017 4:53:20 PM
QuestysRecordID
3746268
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_�_of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: D Sump Manufacturer D Industry Standard 11:�Kofessional Engineer <br /> D Other(Spec) <br /> Test Method Used: ❑Pressure D Vacuum XTydres antic <br /> ❑Other(Specify) <br /> Test Equipment Used:C4 l ,,elf -e, j r A, Equipment Resolution: <br /> Sump# 1'_ Sump# 2-- Sump# damp# <br /> Sump Diameter: ( 3011 <br /> Sump Depth: 2 , ;Lf , <br /> d+ <br /> Sump Material: <br /> Height from Tank Top to Top of " <br /> Highest Piping Penetration: Z ID <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: `( <br /> Condition of sump prior to testing: �y <br /> Portion of Sump Tested` 6V41,rY 9 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both 11 Yes �No d NA ❑Yes �io ❑NA ❑Yes o 11 NA El D N1 11NA <br /> roduct and water)9* <br /> Turbine shutdown response time .J <br /> Is system programmed for fail-safe D Yes �No ❑NA D Yes V$lo D NA El Yes io CJ NA D Yes No ❑NA <br /> shutdown?' <br /> Was fail-safe verified to be <br /> o s fail-safe <br /> -safe D Yes ❑No XNA ❑Yes ❑No )4-NA ❑Yes o ❑NA D Yes No DNA <br /> Wait time between applying <br /> pressure/vacu ater d starting <br /> test: 0` d +► 4 VI 5 tfc�ire 44 tt J`e S <br /> Test Start Time: x: ©tJ F_' US <br /> Initial Reading(RI). �r�•�-�- C, 4. F�' Coa <br /> Test End Time: <br /> Final Reading(RF): r FS 4' cry, -! <br /> Test Duration: 3o r-t'LtCA-k-e S 3 o t---?To ce--�V5 <br /> Change in Reading(RF-R,): �.��;.�. F rl e e e-?..t' <br /> Pass/Fail Threshold or Criteria: c�0�, 3�r,t oo Tit�=— <br /> Test Result; Pass Ll Fail XPass ❑Fail ❑ Pass ❑Fal Pass 0 Ail <br /> Was sensor removed for testing? es ❑No [DNA es LJNo D NAto <br /> Yes ❑No ❑ Yes 0 No 2DA <br /> Was sensor properly replaced an <br /> verified functional after testing?d /Yes ❑No ElNA 1a Yes 11 No ❑NA Yes 1 No El D Yes ❑No D <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up firfailed tests) <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.