Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: 1 <br /> FFF[MYes <br /> te the following checklist: <br /> ❑ No" Is the audible alarm operational? <br /> ❑ No' Is the visual alarm operational? <br /> ❑ No" Were all sensors visually inspected,functionally tested,and confirmed operational?❑ No" Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® NIA <br /> ❑ Yes ❑ No` For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring syste detects a leak. <br /> N/A fails to operate, or is electrically disconnected? If yes' which sensors initiate positive shut-down? (Check aN that apply) ❑ SumplTrench <br /> Sensors; ❑Dispenser Containment Sensors, <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑Yes, ❑No. <br /> ❑ Yes ❑ Na' For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br /> NIA installed), is the overfill warning alarm visible and audible at the tank fill points)and operating properly? If so.at what percent of tank capacity <br /> does the alarm trigger? % <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ❑Yes' ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> 0 Yes ❑ No" Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No' is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E bellow,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: - <br /> Monitoring System Certification Page 2 of 4 2/21107 <br />