Laserfiche WebLink
The best approach for avoiding the detailed trenching requirements is to perform sampling <br /> and other procedures without entry into excavations. A backhoe will be used to bring up soil <br /> samples, and bailers will be used to sample water found in excavations. Entry into <br /> excavations will be avoided, however, should it be necessary to enter an excavation the <br /> procedures described in Section 7.0 will be followed. <br /> 90500000 HAHEALTH%FNLHSP April 21, 1993 <br /> FEMA UST,Final Gencric HSP 11 <br />