My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2300 - Underground Storage Tank Program
>
PR0231585
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 5:00:29 PM
Creation date
11/5/2018 12:53:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231585
PE
2361
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\15600\PR0231585\BILLING 2010 - 2015.PDF
QuestysFileName
BILLING 2010 - 2015
QuestysRecordDate
12/19/2017 11:13:22 PM
QuestysRecordID
3699814
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN- Pae l of 2) <br /> TYPE OF ACTION ❑ I.NEW PLAN ❑ 2.CHANGE OF INFORMATION 090.1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 49°-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY T14E FOLLOWING UST SYSTEM(q)- <br /> L FACILITY INFORMATION <br /> FACILITY ID 4(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) +S '���3/ (, PLAZA 3. <br /> BUSINESS SITE ADDRESS 1560c AELAAI FDhO 103' CITY <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632,2634,2638,2641) <br /> MONITORING EQUIPMENT IS SERVICED tj4j.ANNUALLY <br /> ❑ 99.OTHER(Specify): 4903b <br /> III.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. Lj 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMTTTED. (23 CCR§2632, <br /> 2634)49W <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 49°-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL AJ,ARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: _['a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED _❑d.UNDER VACUUM <br /> PANEL MANUFACTURER._ T1 <br /> LEAK SENSOR MANUFACTURER: rEvD - � ----^^90-9. MODEL#(S): <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER_ 49°.12. 490.13 <br /> MODEL#: <br /> IN-TANK PROBE MANUFACTURER: _ 690'16' MODEL#(S): 49015 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ a WEEKLY 49°-16 <br /> ------!_- <br /> d.MONTHLY___._____._____.___0 e_OTHER(Spec_fy) 490.17 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.pA ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 49°19 <br /> 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49021 <br /> 490.22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 49023 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 090-20 <br /> 490-5 <br /> [:199.OTHER (Specify): 69x26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> CONTINUOUS MONITORING OF PIP PD?ING SUMPS)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49028 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT 1S: a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM - 49029 <br /> PANEL MANUFACTURER: -r;:EUFi -- K-O(JT MODEL#: 490-31 <br /> LEAK SENSOR_MANUFACTURER:_ EE D_E_1L-, _O-o�_ _ __ °9032 _-MODEL#_(S).� ,L_ _ 6x''33 <br /> PIP G LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. PJ�a.YES El b.NO °90-36 <br /> AILUR&DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. -a.YES ❑b.NO 49045 <br /> L\V2.MECHANICAL LINE LEAK DETECTOR(1NLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DE EC C3 <br /> --_ _j_ ____ __" _ <br /> 49.36 <br /> MLLD MANUFACTURER(S): _ <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(E>..LDj TjaT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 49039 <br /> ELLD MANUFACTURE) 690-0° MODEL#S_._._____ 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO °9043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO °90-06 <br /> 4.PIPE INTEGRITY TESTING°seas <br /> TEST FREQUENCY E] a.ANNUALLY ❑ b.EVERY 3 YEARS El c.OTHERS i 49046 49°47 <br /> 5.VISUAL PIPE MONFFORING' 49°48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49049 <br /> Allowed rm momtonn,orwbmiad - enamor awl-i-i--o HSC 25281561 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTIONCR TERIA 123 CCR§2636(1)(3)]. 49050 <br /> 7.NO REGULAT <br /> ago-s1 ED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> ❑ 99.OTHER(Specify) 49052 <br /> 09°53 <br /> UPCF UST-D(122007)114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.