Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> I. f�DC MONITORING LS PERFORMED USING THE FOLLOWING METHOD <br /> �(1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY 490.54, <br /> ❑4.NO DISPENSERS ❑ 3.ELECTRONIC STAND-ALONE 490-946 <br /> �99.OTHER S eci <br /> PANEL MANUFACTURER: __Y '_7;���--�.�,�--pp�` _ <br /> LEAK SENSOR MANUFACTURER: r cp v r-fi-moo— __ 49099_ MODEL H: (f _ 3�'p a9a56. <br /> DETECTION OF A LEAK IN'CO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS 4 sr MODEL 49 5, <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ,�a YES Cl b.NO 49.59 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN Ltd•a YYEES ❑b.NO 4906. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. �L1B,l ❑h.NO 490.61 <br /> 2.UDC CONSTRUCTION IS .SINGLE-WALLED ❑2.DOUBLE-WALLED YES ❑b.NO a9a.6z <br /> IF DOUBLE WALLED: 49NO <br /> —_ UDC[I'?TERSTCfIAL SPACE ISMONITOREDBY:�ILLI UID -Q2,PRESSURE 3_VACUUM 49c 6 <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YES ❑b.NO a906at <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT F.NIiANCED 49069. <br /> MUST BE PERFORMED, PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RF�UIREDy23 CCR <br /> . <br /> SECONDARY CONTAINA7ENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br /> .SPILL BUCKETS ARE TESTED ANNOALLY. -------•-- — ------ -- —_ a00-� <br /> VIII.RECORDKEEPING 49.61 <br /> Thejollowing monitoring/m—aint�n�nce records are kept for this facility: <br /> Alarm logs 490.611, Prsue1 Inspection Records 49.686 <br /> W❑S testing results(and supporting documentation records). 4906sd El Tank integrity resting results ago-rti <br /> G Testing results(and,importing ) ❑ Tank gauging results(and supporting documentation records). .9068, <br /> pporting documentation records).49.6.1 ❑ Corrosion Protection 60-day logs s906eg <br /> NlIfquipment maintenance and calibration records. s9a6an <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familierwith 811 of the following documents relevantto theirjob duties. 490.69, <br /> REFERENCE DOCUMENTS MAINTAINED AOR EL N CT FACILITY(Check all that apply) <br /> rl OPERATING MANUALS FOR ELECTRONIC MONITORING❑ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49.696 <br /> ❑ CA IF RNIA UDERGROUND STORAGE TANK REB"U <br /> 9a69a MENT(Required)a9a6x <br /> ❑ CALIFORNTINIA UNDERGROUND STORAGE TANK LAW 4sc4% <br /> ECTR <br /> ❑ SSTATISTICAL TATTI TT <br /> E WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> ❑ INVEN <br /> SN"49069f <br /> WRCB PUBLICATION:f`"UNDERSTA DING AORY OUTOMATIC TANK GAUGING SYSTEMS"49"9g <br /> ❑ OTHER(Specify):mI M69i <br /> This facility has a"Designated UST Operator"who hes passed the California US7 System Operator Exflm administered by the International Code Council(ICC), <br /> The i Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> D Operation of the UST systems in a mflnner consistent with the facility's best management practices <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> D The facility employee's role with regard to spills and overfills w specified in the UST Response Plan <br /> ➢ Names of contact persons)for emergencies and monitoring alarms.490-7o <br /> Provide additional <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> wrrtments here or indicate ow manes wpithpadditional infortne[ion qn specific monitoring pr doges are attached to this plan 490-71 <br /> �p•/,��`~`�" IIINNN �f 1 r�.$ Rs^CSy � '2'� I � ' , <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenabre of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)ell monitoring records are maintained properly. <br /> The follow' pars s)are respo Bible for p ormin a onito ' g and equipment maintenan <br /> NAME <br /> NAME 49.71 TITLE k.�� <br /> ' 49074 TITLE acs+-2. 4s0az <br /> The Designs per mr shall perfo monthly visual inspection of the£stili l 490.9 <br /> conditions that need follow-up action. ty. provide a repo to the owner/ toq and inform the owner/operator of any <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I the a rm tion rovided herein is true and accurate to the best of m knowledge. <br /> APPLICANT SIGNATURE <br /> 49x76 DATE: 49.77 <br /> APPLICANT NAME(print): ,^,11 49.7e <br /> Wv. APPLICANT TITLE: � A.,'�� � 9aa9 <br /> UPI UST-D(122007)3/4 I <br />