Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK MAR 1 <br /> MONITORING PLAN- Page 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Sq dY0.1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. H�ENVIgpNh�ENOTUIV TY 2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( <br /> L FACILITY INFORMATION NT <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 0 3S �RA�`LL Pt+zA 3 <br /> BUSINESS SITE ADDRESS 1J 00 OLAN Ktpn 103' CITY LATHRA la <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634,2638,264 1) _ <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 4990-in <br /> III.MONITORING LOCATIONS <br /> El 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):Er <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL VARMS (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: L'1 a.DRY ❑ b.LIQUID FILLED El c. <br /> -__ ---PR_ES4S_9U0.9R-IZED_ ❑d.UN-DE-R_�VACUUM <br /> 5 ------------ a49� <br /> ° r <br /> PANEL MANUFACTURER_ MODEL# <br /> ------- --- <br /> o-e <br /> MODLEAKSINSORMANUFACTU�R <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S),(23 CCR§2643) <br /> PANEL MANUFACTURER 49-12. _ MODEL#: <br /> _ <br /> IN-TANK PROBE MANUFACTURER: -- -__ami°. MODEL#(S): <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY °90-16 <br /> _-_-- -_.-_ _ __ ❑ <br /> d.MONTHLY _ -__-_❑ e.OTHER(S- ._--__---._---_49-17 <br /> -- - - --- - - 49-18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 49-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 4Y0.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490.21 <br /> 490.22 <br /> ElS.TANK INTEGRITY TESTING(23 CCR§2643.1): 49-24 <br /> TEST FREQUENCY: E] a.ANNUALLY [Ib.BIENNIALLY ❑ c.OTHER(Specify): 4990-zs <br /> 490.26 <br /> ❑99.OTHER (Specify): 49-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORWG OF/DRY <br /> PIP PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND a9u-zs <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: a.DRYY-❑bb..LIQUID FILLED []c.PRESSURIZED ❑d._UND_E_R VACUUM 5 49°-39 <br /> _PANEL MANUFACTURER: �l;�F+ M'�I _� _�- a30�-MODEL#- TLS <br /> aw31 <br /> _ _ _- - °94 : ❑b.N_O__ _ 4-33 <br /> #(LEAK SENSOR MANUFACTURER: EEDER_ V S)f�_ - 490"3 <br /> PIP G LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN . a_YES <br /> AILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 1A a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DE ECTED 23 CCR$2636 _-______..--__ __ _-----_--_-- 49-36 <br /> �_ �_-___-- 490.37 Boo 49-38 <br /> MLLD MANUFACTURER(S): I MODEL#(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(Et.LU)`fHaT ROUTINELY PERFORMS 3.0 g.p.b.LEAK TESTS (23 CCR§2636) __ 490-39 <br /> -- .--_ - _ MO <br /> ELLD MANUFACTURER(S) -__DEL# -'490-1 <br /> _ __ <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2gP h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490'43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS i 490.4649047 <br /> ❑ 5.VISUAL PIPE MONITORING. 49-4s <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 49-49 <br /> 'Allowed for mmlronn of mwne emm mw enemor fuel i in only r HSC 25281.5b 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)). 490-s0 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.715 CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> a9o-sz <br /> ❑ <br /> 99.OTHER(Specify) a9-s3 <br /> UPCF UST-D(12/2007)1/4 <br />