Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 49a54a <br /> I. VDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD °vas°b <br /> I.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(S 1 ): ___ <br /> PANEL MANUFACTURER: YY�t=� � 49°-55 MODEL#: (fi — 'j JV °so-se. <br /> LEAK SENSOR MANUFACTURER: E — °90'sr MODEL#(S) °vase <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS 5�,/&YES [3b.NO 490'59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN a.YES ❑ 90'5° <br /> b.NO 4 , <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ,@,a.YES E]b.NO 4�1 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. pd-a.YES ❑b.NO 4voa2 <br /> 4a63 <br /> 2.UDC CONSTRUCTION IS Of.SINGLE-WALLED [12.DOUBLE-WALLED <br /> IF DOUBLE WALLED: 4oa4a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑I LIQUID ❑2.PRESSURE ❑3 VACUUM _ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YES ❑b.NO 49b <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL HOARD THAT ENHANCED 4oa5. <br /> LEAK DET N ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR2644.1 <br /> _ .SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. - 4os6 <br /> 4�r <br /> SPILL BUCKETS ARE TESTED ANNUALLY. <br /> VIII.RECORDKEEPING <br /> TheJJollowing monitoring/maint�notice records are kept for this facility: <br /> Alarm logs 4oaaa Visual Inspection Records 4odeb ❑Tank integrity testing results 4oasc <br /> 0 SSR testing results(and supporting documentation records). 49o�5ea ❑ Tank gauging results(and supporting documentation records). 4vassa <br /> RnS G Testing results(and supporting documentation records).4vassf EDCorrosion Protection 60-day logs 4vacss <br /> Mtquipment maintenance and calibration records. 490�68a <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 4oc9a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ❑ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)4as% <br /> ❑ OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)4o.69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4%-6W <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 4os9a <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION'490-W <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"4ob9g <br /> ❑ OTHER(Specify):m691.M6 <br /> Lj This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.49a70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.4o-71 <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that I)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance. <br /> NAME 472 TITLE 4 7 <br /> NAME 4va74 TITLE 49a15 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. - <br /> XIL OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:Ice 'fy that e' orm tion provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 4ar6 DATE: °90'°0 <br /> 03 o� <br /> L T - un / 2.FaCL11 . / 3.A �' f <br /> APPLICANT NAME(print): 690'rg APPLICANTTITLE: 1 4ar9 <br /> /eh<s N a <br /> UPCF UST-D(122007)3/4 / 9�j <br />