Laserfiche WebLink
April 6, 2007 <br /> HEALTH AND SAFETY PLAN <br /> UST REMOVAL <br /> 15600 S. HARLAN ROAD <br /> LATHROP, CALIFORNIA <br /> INTRODUCTION <br /> This Health and Safety Plan (HSP) delineates the basic safety requirements for the UST Removal <br /> work at the property located at 15600 S.Harlan Road in Lathrop,California. The work includes the <br /> operation of heavy equipment such as backhoes and vacuum trucks. Work at the site consists of, <br /> rinsing the tanks,inerting the tanks,disconnecting the piping from the tanks and removing the tanks <br /> with a backhoe and loading the tanks and piping into a bin for hauling and disposal. <br /> The provisions set forth in this HSP will apply to all employees of Walton Engineering, Inc. <br /> (Walton) and all other contractors/subcontractors working on this project. The <br /> contractors/subcontractors may elect to modify these provisions,but only to upgrade or increase the <br /> safety requirements,and only with the concurrence of Walton,as designated and accepted in writing. <br /> This HSP addresses the expected potential hazards that may be encountered for this project. Field <br /> activities are planned to begin in April,2007,with the duration estimated at approximately one day. <br /> If changes in site or working conditions occur as the activities progress,addenda to this HSP will be <br /> provided by Walton. <br /> AUTHORITY FOR SITE SAFETY <br /> Walton employee responsible for the project safety is the Project Manager. The Health and Safety <br /> Coordinator is responsible for the overall Health and Safety Program of Walton and may choose to <br /> audit any site for compliance and take appropriate action to correct deficiencies. The Project <br /> Manager is responsible for implementing the provisions of this HSP,providing a copy of this HSP to <br /> the field personnel, and advising personnel involved in site activities on health and safety matters. <br /> The Project Manager has the authority to audit site activities for compliance with the provisions of <br /> this HSP and may suspend or modify work practices or dismiss subcontractors whose conduct does <br /> not meet the requirements specified in this HSP. <br /> The Project Manager is responsible for the dissemination of the information contained in this HSP to <br /> Walton personnel assigned to the project, and to the responsible representative of each <br /> contractor/subcontractor firm working with Walton on the project. The Project Manager will act as <br /> the Site Safety Officer. As such, the Project Manager is responsible for adequately addressing the <br /> following items: <br /> XXXX Street West Sacramento, California 95691 (XXX)XXX-XXX <br /> Walton 077-013.bsp November 9, 1998 <br />