My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15688
>
2300 - Underground Storage Tank Program
>
PR0527026
>
REMOVAL_2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 12:25:38 PM
Creation date
11/5/2018 12:57:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2007
RECORD_ID
PR0527026
PE
2361
FACILITY_ID
FA0018313
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15688
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620077
CURRENT_STATUS
02
SITE_LOCATION
15688 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\15688\PR0527026\REMOVAL 2007.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
114W V <br /> Appendix A <br /> Health and Safety Plan <br /> • Safety supplies and equipment inventory onsite <br /> • Training programs and hazard communication <br /> • Procedures for reporting accidents or incidents <br /> • Decontamination and contamination-reduction procedures <br /> The Project Manager has the authority to suspend work any time he or she fords that the provisions <br /> of the HSP are inadequate for worker safety. <br /> SAFETY AND ORIENTATION MEETINGS <br /> Field personnel from Walton and its contractors/subcontractors will attend a project specific training <br /> meeting for safety issues and review the project tasks before beginning work. The meeting will be <br /> led by the Project Manager. <br /> HAZARDOUS MATERIALS PRESENT <br /> The work at the site will may be performed in the presence gasoline and benzene. <br /> TABLE 1: HAZARDOUS COMPOUNDS <br /> 710 E. LASSEN AVE. <br /> CHICO, CALIFORNIA <br /> Hazardous Route of Exposure <br /> Contaminant Property Entry Limits <br /> Benzene Carcinogen Inhalation/Ingestion 0.01 ppm <br /> Methyl t-butyl ether Carcinogen Inhalation/Ingestion 0.01 ppm <br /> Gasoline Toxic Inhalation/Ingestion 10 ppm <br /> GENERAL PROJECT SAFETY REQUIREMENTS <br /> Project activities will be conducted in accordance with the following minimum safety requirements: <br /> Eating, drinking, and smoking will be restricted to a designated area. The Project Manager will be <br /> responsible for taking necessary steps to protect employees from physical hazards, including: <br /> • Falling objects, such as tools or equipment <br /> • Tripping over hoses, pipes, tools, or equipment <br /> • Slipping on wet or oily surfaces <br /> • Insufficient or faulty protective equipment <br /> • Insufficient or faulty equipment or tools <br /> Walton Engineering <br /> Walton 077-013.hsp 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.