Laserfiche WebLink
It is recommended that the following be addressed: <br /> • Authorize Corrpro to carry out an annual re-survey of the tank cathodic protection system to <br /> ensure future correct operation of the CP system and compliance with State and Federal <br /> regulations. The regulations stipulate that STIP-3 tank CP systems are re-surveyed at least <br /> every three (3) years. Corrpro will be pleased to provide a quotation for the 2002 re-survey <br /> upon your request. <br /> Thank you for this opportunity to serve you. If you have any questions or if we may be of <br /> additional assistance, please do not hesitate to call the undersigned at (510) 614-8800, Ext. 223. <br /> `eery truly yours, <br /> YCO;RRP0;(;OMPANIES, INC. <br /> Ian Oakley <br /> Senior Corrosion Engineering <br /> IO/io/ts/Server G: Regional/All Reports/2001 Reports/575-2252/2252.xls <br /> Encls: Cathodic Protection Survey Data, Invoice <br /> 2 <br />