My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
9508
>
2300 - Underground Storage Tank Program
>
PR0231588
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 11:36:18 AM
Creation date
11/5/2018 1:03:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231588
PE
2381
FACILITY_ID
FA0003917
FACILITY_NAME
BORAL ROOFING
STREET_NUMBER
9508
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19321003
CURRENT_STATUS
02
SITE_LOCATION
9508 HARLAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\9508\PR0231588\REMOVAL 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA"WLING PROTOCOL FOR ROUTINE TANK REMOVALS <br /> The fallowing represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native sods beneath the ranles invert (taal's bottom) at a collection depth not to exceed 2 -4 feet. If <br /> contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted <br /> within five (5) working days pursuant to California Health &Safety Code,Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK S= NMM UM NUMBER LOCATION OF SOIL SAMPLES II <br /> (Gallons) of SOIL SAWLES <br /> < 1,000 1 per TankFill OR Pump End of Tank <br /> I,CCO IO,CCO 2 per Tank 1 at each End of Tank �I <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank II <br /> PIPING AND STOCKPILE <br /> EKPLDING SOIL SAbLDLES I Sample every 20 lineal feet <br /> I VII T.�-,K & PIPING 570C.K?= SA.MPLcS I 2 Samples every 50 cubic yards <br /> WATER IS PRESENT iN TANK PIT <br /> TANK TAY-,<SiZ MLNLtifUM NUM9ER LOC?.TION of SOIL ML`M 9-TM NUM3ER Of <br /> (Gallons) I of SOLI SAbkPL�S I SAMPLES I WAicR SA,NCOL=S <br /> j <br /> < 10,000 Fromwall nett to tank <br /> Single Tank I 2 I ends at soil/groundwater I 1 <br /> ince;ace <br /> > 10,000 ORFrom wall nen cc Link <br /> Tank CIuster I 4 I ends at soil! I 1 <br /> groundwater interface <br /> SLAB PRESDT IN THE TANK PIT <br /> Soil samples shall be Obtained beneath the slab within native soils. Penetration through the obstruction will be required in <br /> order to collect the samples. (Physical removal of the obstrucioa will allow sampling according to the above condiions.) <br /> TANK TANK SIZE M�f NUMBERI LOCATION of SOIL SANTLES —I <br /> (Gallons) of SOIL SA��iPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,CC0 - 10,000 5 per Tank Center and Ends OR Sides Of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> E:-I 23 047 (Revised 7/10/92) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.