My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2300 - Underground Storage Tank Program
>
PR0540345
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:44:41 PM
Creation date
11/5/2018 1:13:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0540345
PE
2351
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
Way
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5655 Hood Way
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOOD\5655\PR0540345\COMPLIANCE INFO 2016 - PRESENT.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aGFrui=R-RYAN IHC. GR Job# <br /> F. In-Tank Gauging f SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> nyder oatrevuu <br /> This section must be completed if In-tank gauging equipment is used to perform leak detection monitoring <br /> x <br /> Complete the following checklist: <br /> [] yes „L] o Has all Input wiring been inspected for proper entry and termination Including testing for ground faults? <br /> I] Yes [] Nn` Were all tank gauging probes visually Inspected for damage and residue buildup? j <br /> Q Yes ❑ No' Was accuracy of system products level readings tested? <br /> l] Yes ❑ No' Was accuracy of system water level read ngs tested? <br /> Yes ❑ No' Were all probes reinstalled property? <br /> [] Yes x❑ Na' lWere all Items on the equipment manufacturers maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD); 0 Check this box if LLias are not installed, <br /> Complete the following checklist: <br /> Yes ❑ or equipment start-up or annual equipmentcerlincalion,was a leaks mulat6d to veriry 1.1.0-performance7icheck all <br /> ❑ <br /> NIA that apply) Simulated leak rate ® 3 g.p h ❑ 0 1 g p h ❑ G 2 g.p.h. <br /> ❑ Yes E No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> E Yes [] No' Was the testing apparatus properly calibrated? <br /> © Yes ❑ No' For Mechanical LLDs,does the LLD restrict product flow It It detects a leak? <br /> NIA <br /> I-L Yes ❑ No' For electronic LLDs,does the turbine automatically shut off If the LLD detects a leak? j <br /> 0 NIA <br /> Yes 0 No' For electronic LLDs,does the Curb ne automatically shut off f any portion of the monflodng system is disabled or <br /> ❑ NIA Dlsconnected7 <br /> ❑ No' For of branic LLDs,does the turbine automatically shut off if any portion of the mcnilortng system malfunctions or <br /> ❑ NIA faits a test? <br /> [L- Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visuaI4 inspected? <br /> ❑ N/A <br /> U 11 Yes [3 No' were all items on the equipment manufacturer's maintenance checklist compfeled7 <br /> in theSection H,below,describe how and when Lhasa deficiencies were orwill be corrected. <br /> G. Comments: <br /> Only tested the diesel leak detector.Tested from furthest lisp.Test passed, tested a <br /> second time,which also passed, <br /> t> k <br /> Monitoring System Certification Page 3 of 4 13W <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.