Laserfiche WebLink
C1ETTiFR-RYAN INC. GR Jot?# 172b4692 <br /> D. Results of Testing/Servicing <br /> Software Version Installed <br /> Complete the following checklist: <br /> r Yes (3 5655 Is the audib`e alarm operational? <br /> rL Yes [] Nn' Is the visual alarm operational? <br /> [] Yes No' Were all sensors v.sually inspected functionally tested,and confirmed operatbonal? <br /> [L- Yes [] No* Were all sensors Installed at lowest pont of secondary containment and positioned so that other equipment will not Alerfers with their <br /> proper operation? <br /> ry Yes O N' If alarms are relayed to a remote monitoring station.Is all communication equ pmenl(e g modem)operational? <br /> T Yes d No- For pressurized pip no systems,does the turbine automat tally shut down if the p plug secondary containment moniUng system <br /> NIA detects a leak,fail s to operate.or is Cectricalty disconnected?If yes which sensors Initiate positive shut-down?(Check all that apply) <br /> El Sumprrrench Sensor: Q Dispenser Conla nmenl Sensor Did you confirm pos.five shut-down due to leaksjU sensor <br /> faltureldisconnection7 © Yes Q No <br /> Yes © No For tank systems that utilize the mon loring system as the primary tank overfir warning device(i.e no mechanical overfill prevention <br /> NIA valve is Insta'led),is the overt 1 warning alarm visible and audible at the tank fill point(s)and operating propenyl If so,at what percent <br /> of tank capacity does the alarm trigger? % <br /> Yes No Was any mon toning equipment replaced?It yes,identify specific sensors,probes.or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below <br /> [] Yes No Was liquid found nside any secondary containment systems designed as dry systems?(Check all that apply) []product ❑Wailer If <br /> yes,describe causes in Section E below. <br /> Yes No' Was mon Loring system set-up revlewad to insure proper settings?Attach set-up reports if applicable. <br /> G Yes [] No' Is all monitoring equipment operational per manufactues specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> A <br /> E. Comments: <br /> x Removed the air bubble from the brine for sensor.Verified sensor operational. <br /> x <br /> x <br /> 24 ;9P <br /> x <br /> • — 3 . . �r,t L A n�,Pa���H•E;�LTa— <br /> Monttoring System Certification Page 2 of 4 <br /> -r <br />