Laserfiche WebLink
L ,s <br />Attachment 1 - Continuation Sheet SA No. <br />Contractor W.O. No. <br />Date <br />5.a. The Contractor shall remove, transport and dispose of the underground tank in <br />accordance with all federal, state and local regulations applicable to this <br />project. <br />b. The Contractor shall coordinate all its work with the field representative, <br />and the project manager, Hassan Pejuhesh at (916) 322-8994. <br />c. The Contractor shall notify the appropriate local agency at least 48 <br />hours prior to initiating any work at this facility. <br />d. The Contractor shall comply with all security and other pertinent <br />regulations enforced at the facility. <br />e. The Contractor shall obtain plans of the existing underground storage <br />tank, if available, from the field representative and make open <br />excavations as required to remove the underground storage tank. <br />f. The Contractor shall verify all existing utility services in the <br />immediate area prior to the work, and shall be responsible for any <br />damages to these services. <br />g. The Contractor shall sawcut,�excavate, remove and dispose offsite the <br />pavement and/or concrete situated above the underground tank prior to <br />the excavation to remove the underground tank. This requirement may be <br />waived by the project manager depending on the conditions of the <br />existing surface. <br />h. The Contractor shall provide a safety plan when the excavation is over five <br />(5) feet, zero (0) inches deep. <br />i. All work, including equipment, materials and installation shall conform <br />to California Administrative Code, Title 24, Building Standards (CAC, <br />Title 24) and to California Administrative Code, Title 8, Chapter 4, <br />Division of Industrial Safety (DIS). <br />j. The Contractor shall backfill the tank cavity to 90 percent compaction. <br />k. The Contractor shall replace or repair disturbed surfaces to match its <br />original conditons. <br />Subsidence of the disturbed surface shall be the responsibility of the <br />Contractor and corrective measures shall be made by the Contractor <br />forthwith. <br />Damage to existing facilities is the responsibility of the Contractor <br />and corrective measures shall be taken to bring such facility back to <br />its original condition. <br />