Laserfiche WebLink
M <br />..+ <br />Attachment 1 - Continuation Sheet SA No. <br />Contractor W.O.'10. <br />Date <br />m. The cost of performing Item Na. 5 above shall not exceed $ <br />6. Contractor shall remove, transport and dispose of any product remaining <br />in the tank at a cost not to exc_ed $ <br />7. The Contractor shall replace the removed concrete and/or pavement back to <br />its original condition at a cost not to exceed $ , <br />8. If required by the .local jurisdiction, the Contractor shall take two soil <br />and/or groundwater samples, one from each end of the tank(s), at <br />elevation of three(3) feet directly below the bottom of the tank. <br />a. The Contractor shall have all samples analyzed by a certified laboratory <br />acceptable to the appropriate local jurisdiction and the Regional Water <br />Quality Control Board for the total petroleum hydrocarbon, Benzene, <br />Toluene, Xylene and total or.3anic lead content, <br />b. Sampling, preservation and analysts shall be done in accordance with the <br />requirements of the appropriate local jurisdiction and the Regional Water <br />Quality Control Board. <br />c. The cost of analysis of such samples is not included in this contract. <br />9. Total compensation shall not:exceed $ (dollars). <br />10. Lump sum payment shall be made upon completion of the work on the basis <br />of unit rates set forth in the contract proposal. <br />tl <br />