Laserfiche WebLink
M <br />Agreement No. UT014' <br />W.Q. No. GST 820 <br />Page 2 of 3 <br />Tect.-•_cal SPCC:fications: <br />The Contractor shall back;ill tt:e tank cavity to 90 percent <br />compaction. <br />.. The Contractor shall replace or repair disturbed soil surfaces to <br />match their original conditions. <br />Subsidence of the disturbed su-face shall be the responsibility of the <br />Contractor and corrective measures shall be made by the Contractor <br />forthwith. <br />Damage to existing facili!:es is the responsibility of the Contractor <br />and corrective measures sha:l he taken to bring such facility back to <br />its original condition. <br />m. The cost of performing Iter No. 4 above shall not exceed $ 7,450.00. <br />Cnntractnr shall remove, transport and dispose of all product and sludge <br />ema.ning .n the tank at a cost not to exceed $ 825.00. <br />tractor shall replace �e removed concrete and/or pavement back. to <br />.t's or.ginal condition at a cyst not to exceed $ 4,969.00. <br />The Contractor shall takewo soli and/or groundwater samples, one <br />t <br />from each end of the tank, at a:evation of three (3) feet directly <br />below the bottom of the ta-k. The cost shall not exceed $ 2,440.00. <br />if .more than two (2) samples are required, they shall be obtained and <br />analysed at a cost not to e¢fePd $ 250,00 per sample. <br />7. The Contractor most notify the Cffice of the State Architect in <br />writing, addressing the se;ection of a Certified Laboratory. Invoices <br />from the Iaborato-y must reference the Agreement .Number. <br />The Contractor shall have all the samplings, preservation, and <br />analysis done in accordance with the requirements of the appropriate <br />local Jurisdiction and the Reccional Water Quality Control Board for <br />total petroleum hydrocarbons fdiese' or gasoline as appropriate) and <br />BTX b E. <br />9. The bid proposal shalt be the sum of Item Numbers 4.m., 5, 6 and 7.a. <br />