Laserfiche WebLink
L Agreement No. UT0143 <br />W.O. No. G5T B20 <br />Page 3 of 3 <br />'.echr-',gal Specifications: <br />9. ASBESTOS CONTAINING MATERIALS DISTURBED IN THE COURSE OF PERFORMING <br />CONTRACT WORK. <br />In the event that existing construction materials are identified as <br />containing asbestos materials, and are disturbed in the course of <br />performing work under this contract, the Contractor shall cease all work <br />immediately and notify the State Construction Supervisor and/or Project <br />Manager. After site conditions and extent of asbestos related work is <br />assessed by the State, a separate contract will be issued to a contractor <br />registered and certified for asbestos abatement work. Work activities <br />under this contract shall not resume until such time that abatement work <br />is complete under separate contract. <br />Under existing State statute and the California Administrative Code a <br />prime contractor who is not certified to perform asbestos abatement work <br />may not subcontract asbestos related work. <br />