My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0231906
>
COMPLIANCE INFO 2001-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2021 1:08:13 PM
Creation date
11/5/2018 3:42:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2010
RECORD_ID
PR0231906
PE
2361
FACILITY_ID
FA0003776
FACILITY_NAME
KWIK SERV*
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\420\PR0231906\COMPLIANCE INFO 2001-2010.PDF
QuestysFileName
COMPLIANCE INFO 2001-2010
QuestysRecordDate
5/19/2017 11:33:18 PM
QuestysRecordID
3391364
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[I+IED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN- (Page I oft . . <br />TYPE OF ACTION ❑ 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION 4WI <br />PLAN TYPE ❑ 1. MONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. 4� 2 <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM <br />' I. FACILITY INFORMATION <br />FACILITY ID 6 (Agertcy Use Oily) 1 <br />BUSINESS NAME (Same as FACILITY NAME) T <br />D <br />3, <br />BUS [NESS SITE ADDRESS 103' <br />CITY e too. <br />U. EQUIP5ffM TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line Icak detectors, etc.) must be perforated at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR 2632 2634 2638 2641 <br />MONITORING EQUIPMENT IS SERVICED L ANNUALLY ❑ 99, OTHER (Specify): 490'3' <br />490-3b <br />III. MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. El 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)4w4 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br />y,pl i.0-,"1i11Uvwaa.ca.anvi�a�,atu.n-rUI(,r.I:UIYVARTUUN"l"AINMENT. <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS, (23 CCR §2632.2634) <br />SECONDARY CONTAINMENT IS: a. DRY ❑ c. PRESSURIZER ❑ d. UNDER VACUUM <br />PANEL MANUFACTURER: `tti ri - t0- 490•7' MODEL #: <br />LEAK SENSOR MANUFACTURER: y IV, <br />490A, MODEL 6(S): <br />EF -2. AUTOMATIC TANK GAUGING (ATG) SYSTEM ED TO MONITOR (23 CCR §2643) <br />PANEL MANUFACTURER: I490-.2. MODEL ft: <br />IN -TANK PROBE MANUFACTURER: <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS <br />❑ d. MONTHLY <br />❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />❑ c. OTHER (Specify): <br />PROGRAMMED TESTS: ❑ a. 0.1 g p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: ❑ s 36 HOURS <br />5. TANK INTEGRITY TESTING (23 CCR §2643.3): <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />❑ b. 60 HOURS <br />❑ 99. OTHER (Specify): <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check an that I <br />1. CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />VISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: Cda, DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />PANEL MANUFACTURER 490.30 MODEL N: - A <br />LEAK SENSOR MANUFACTURER: /( !( 490-52 MODEL V(5 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. 04. YES ❑ b. NO <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Va.YES ❑ b. NO <br />2. MECHANICAL LINE LEAK DETECTOR IMLLD) THAT ROUTINELY PERFORMS 3.0 g.p h. LEAK TFSTS AND RESTRICTS C <br />PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR §2§M <br />MLLD MANUFACTURER(S): - _ 490 3r MODEL #(S): -V52 -0C <br />3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3,0 g p h. LEAK TESTS (23 CCR §2636) <br />ELLD MANUFACTURER(S) 49040. MODEL k(S): } <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g,p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. 110. YFS ❑ b. NO <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />4, PIPE INTEGRITY TESTING 490.15 <br />TEST FRE UENCY 0 a. ANNUALLY b. EVERY 3 YEARS 0 c. OTHERS if <br />5, VISUAL PIPE. MONITORING. <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIA(. MONTHLY & EACH TIME SYSTEM OPERATED' <br />-- Altowed far mmdto t of unburied emer oxyienerm fuel DiPinOardy Pn HSC_W21135(b)(3) <br />] 6. SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR §2636(a)(3)j. <br />7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANKS <br />i ❑ 99. OTHER (Specify) <br />UPCF UST -D (1 28007) 1/4 <br />490.3 <br />49" <br />i9" <br />49610 <br />490-11 <br />490.13 <br />490-13 <br />490.16 <br />490-13 <br />490.11 <br />490•.9 <br />490.20 <br />490-21 <br />490-72 <br />490.23 <br />490-24 <br />490.23 <br />490-29 <br />490.31 <br />490-33 <br />490-34 <br />490.33 <br />490.36 <br />0. t 2n <br />4-39 L/ <br />49043 <br />490.14 <br />490-41 <br />49049 <br />490-50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.