My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
COMPLIANCE INFO 2006 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2021 4:57:32 PM
Creation date
11/5/2018 3:55:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2007
RECORD_ID
PR0231349
PE
2351
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\800\PR0231349\COMPLIANCE INFO 2006 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2007
QuestysRecordDate
2/16/2018 6:39:17 PM
QuestysRecordID
3798594
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TAMC MONITORING SYSTEM CER=CATION <br /> in-Tank Gauging / SIR Equipment: Permit Number: <br /> F. <br /> Zi Check this box if tank gauging is used only for inventory control_ <br /> ❑ Check this box if no tans:gauging or SIR equip nt is installed <br /> Tris section must be, completed if in-tanL ga ` ng equipment is used to perform leak deieciion moniioring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been ins ected for proper entry and termination,including testine for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes 'sually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product el readings tested? <br /> ❑ Yes I ❑ No* Was accuracy of system water level re as tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's aintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were r will be corrected. <br /> G. Eine Leak Detectors (LLD): C] Check this box if LLDs e not installed. <br /> Com let e the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment gertification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 3 g.p.h.; ❑0.1 g.p.h. ; ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational d/accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly ibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,.does the Lr <br /> restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the ine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> Z) Yes 71 No* For electronic LLDs, does the turb automatically shut off if any portion of the monitoring system is disabled <br /> ❑ NIA or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine auto \y shut off.f any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring cont ections been visually.inspected? <br /> ❑ NIA <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section I-i below,-describe how and when these deficiencies were or will be corrected. <br /> 1-1. Comments: <br /> jj <br /> DEH'HM-9301 (Rev 08/02). Page 3 of 4 County of San Diego-DEH-Hazardous Materials Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.