Laserfiche WebLink
LDT 880 - LEAK DETECTOR LHt: ;KLIS i <br />All <br />CC-NTRACT,7R'CUSTOMER <br />�7co� Co <br />' <br />DATE4 - (1 ► GU <br />1 <br />PRQQ�T a� <br />''cc <br />LOCATION <br />tri U CjJ� <br />TECHNICIAN <br />14 <br />I SUBMERSIBLE PUMP IDENTIFICATION <br />CHECK MFG. <br />INDICATE MODEL NO. IF KNOWN <br />LEAK DETECTOR ISOLATED <br />RECORD SERIAL # <br />a�o� Z\lad 2 b�CG <br />REDDRESSER <br />TOKHEIM <br />GILBARCO <br />BENNETT <br />WAY NE <br />A.O. SMITH <br />BOWSER <br />KEENE <br />SOUTH <br />WEST <br />OTHER <br />JACKET <br />OTHER <br />MODEL 116-030 <br />MODEL 116-017LMODEL <br />116-011 A <br />MODEL 585PM <br />WITH BOTTOM SELECTOR IN PRESSURE STEP TEST <br />PLD-2SEC <br />DLD 2SEC <br />RECORD TIME IN SECONDS GUAGE <br />DLD 5SEC <br />DLD 2SEC <br />NEEDLE REMAINS IN COLORED ZONE SEC. <br />HEX HEAD <br />HEX HEAD <br />WITH BOTTOM SELECTOR IN 3 GPH TEST POSITION <br />ROUND HEAD <br />SQUARE HEAD <br />A) MEASURE AND RECORD VOLUME IN <br />CALIBRATED BEAKER FOR 60 SECOND TESTI Sc� ML <br />CALIBRATED BEAKER FOR 60 SECOND TEST ML <br />B) OPEN DISPENSER NOZZLE OR PLACE BOTTOM <br />B) PLACE BOTTOM SELECTOR IN DISPENSER <br />SELECTOR IN DISPENSER NOZZLE POSITION. <br />NOZZLE POSITION. <br />FLOW RATE OF APPROX. V/2-3GAL PER MINUTE <br />II LEAK DETECTOR IDENTIFICATION <br />PRE-TEST CONDITIONS <br />VOLUME OF PRODUCT FLUSHED THRU LINE GALLONS ` <br />OTHER COMMENTS LQc A 1?�C,,L< Or <br />TEST PROCEDURE <br />LEAK DETECTOR INSTALLED <br />LEAK DETECTOR ISOLATED <br />TEST AT DISPENSER <br />y <br />CHECK TYPE <br />REFER TO LDT INSTRUCTIONS <br />III GENERAL LINE AND PUMP INFORMATION <br />III GENERAL PUMP INFORMATION <br />RED JACKET <br />ED JACKET <br />AIR -VAPOR TEST WITH PUMP OFF MEASURE <br />RED JACKET <br />TOKHEIM <br />OTHER <br />MODEL 116-030 <br />MODEL 116-017LMODEL <br />116-011 A <br />MODEL 585PM <br />WITH BOTTOM SELECTOR IN PRESSURE STEP TEST <br />PLD-2SEC <br />DLD 2SEC <br />RECORD TIME IN SECONDS GUAGE <br />DLD 5SEC <br />DLD 2SEC <br />NEEDLE REMAINS IN COLORED ZONE SEC. <br />HEX HEAD <br />HEX HEAD <br />WITH BOTTOM SELECTOR IN 3 GPH TEST POSITION <br />ROUND HEAD <br />SQUARE HEAD <br />A) MEASURE AND RECORD VOLUME IN <br />PRE-TEST CONDITIONS <br />VOLUME OF PRODUCT FLUSHED THRU LINE GALLONS ` <br />OTHER COMMENTS LQc A 1?�C,,L< Or <br />TEST PROCEDURE <br />LEAK DETECTOR INSTALLED <br />LEAK DETECTOR ISOLATED <br />TEST AT DISPENSER <br />FROM PRODUCT LINE - TEST AT PUMP PIT <br />REFER TO LDT INSTRUCTIONS <br />III GENERAL LINE AND PUMP INFORMATION <br />III GENERAL PUMP INFORMATION <br />RECORD OPERATING PUMP PRESSURE psig. <br />FLUSH LDT TESTOR <br />AIR -VAPOR TEST WITH PUMP OFF MEASURE <br />RECORD OPERATING PUMP PRESSURE prig. <br />AND RECORD z% ML <br />IV PRESSURE STEP TEST <br />IV PRESSURE STEP TEST- SUBMERSIBLE PUMP <br />REMAINS ON THRU-OUT TEST PROCEDURE <br />WITH BOTTOM SELECTOR IN PRESSURE STEP TEST <br />WITH BOTTOM SELECTOR IN PRESSURE STEP TEST <br />POSITION TURN ON PUMP <br />POSITION ROTATE ISOLATOR FULLY (CCAM <br />RECORD TIME IN SECONDS GUAGE <br />RECORD TIME IN SECONDS GUAGE <br />NEEDLE REMAINS IN COLORED ZONE -2-SEC. <br />NEEDLE REMAINS IN COLORED ZONE SEC. <br />V 3 GALLON PER HOUR LEAK SIMULATED TEST <br />1p <br />V 3 GALLON PER HOUR LEAK SIMULATED TEST <br />WITH BOTTOM SELECTOR IN 3 GPH TEST POSITION <br />WITH BOTTOM SELECTOR IN 3 GPH TEST POSITION <br />A) MEASURE AND RECORD VOLUME IN <br />A) MEASURE AND RECORD VOLUME IN <br />CALIBRATED BEAKER FOR 60 SECOND TESTI Sc� ML <br />CALIBRATED BEAKER FOR 60 SECOND TEST ML <br />B) OPEN DISPENSER NOZZLE OR PLACE BOTTOM <br />B) PLACE BOTTOM SELECTOR IN DISPENSER <br />SELECTOR IN DISPENSER NOZZLE POSITION. <br />NOZZLE POSITION. <br />FLOW RATE OF APPROX. V/2-3GAL PER MINUTE <br />FLOW RATE OF APPROX. 112-3GAL PER MINUTE <br />WILL BE OBSERVED. <br />WILL BE OBSERVED. <br />DOES GUAGE NEEDLE MOVE TO LOWER ✓ <br />DOES GUAGE NEEDLE MOVE TO LOWER <br />END OF COLORED ZONE YES NO <br />END OF COLORED ZONE YES NO <br />DOES FLOW RATE INCREASE TO APPROX./ <br />DOES FLOW RATE INCREASE TO APPROX. <br />V/2-3GAL PER MINUTE YES NO <br />1'/2-3GAL PER MINUTE YES NO <br />C) CLOSE DISPENSER NOZZLE OR PLACE BOTTOM <br />C) PLACE BOTTOM SELECTOR IN <br />SELECTOR IN 3GPH TEST POSITION: <br />3GPH TEST POSITION: <br />GUAGE RETURN TO COLOREDGUAGE <br />RETURN TO COLORED <br />ZONE YES /'NO <br />ZONE YES—NO— <br />ESNOGUAGE <br />GUAGEDOES NOT RETURN TO <br />GUAGE DOES NOT RETURN TO <br />COLORED ZONE YES NO <br />COLORED ZONE YES NO <br />GAUGE GOES TO OPERATING <br />GAUGE GOES TO OPERATING <br />PRESSURE YES NO <br />PRESSURE YES NO <br />PASS <br />SLEA <br />PASS <br />LEAK DETECTOR TEST <br />DETECTOR TEST <br />FAILK <br />FAIL <br />PURPORANAPORLESS FORM 880A C <br />0 <br />A <br />D <br />O <br />z <br />r__ <br />