My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 1986 - 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:34:40 PM
Creation date
11/5/2018 3:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1998
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LU I btfU - Lr -A& Ut I CU I UK Utltl.KLrb I <br />CONTRACTOR' <br />DATE ll > PRODUCT !!'' <br />TECHNICIAN <br />I SUBMERSIBLE PUMP IDENTIFICATION <br />GUSIUMtN <br />LOCATION l <br />CHECK MFG. <br />U <br />TEST AT DISPENSER <br />INDICATE MODEL NO. IF KNOWN <br />0 <br />RECORD SERIAL #b Q _ 1- <br />y S <br />RED <br />JACKET <br />TOKHEIM <br />GILBARCO <br />BENNETT <br />DRESSER <br />WAYNE <br />A.O. SMITH <br />BOWSER <br />KEENE <br />O <br />JACKET <br />TOKHEIM <br />Z <br />MODEL 116-030 <br />i <br />-MODEL 116-011 A <br />MODEL 585PM <br />CHECK MFG. <br />LEAK DETECTOR ISOLATED <br />TEST AT DISPENSER <br />INDICATE MODEL NO. IF KNOWN <br />CHECK TYPE <br />RECORD SERIAL #b Q _ 1- <br />y S <br />RED <br />JACKET <br />TOKHEIM <br />GILBARCO <br />BENNETT <br />DRESSER <br />WAYNE <br />A.O. SMITH <br />BOWSER <br />KEENE <br />SOUTH OTHER <br />WEST -7 <br />JACKET <br />TOKHEIM <br />OTHER <br />MODEL 116-030 <br />MODEL 116-017 <br />-MODEL 116-011 A <br />MODEL 585PM <br />POSITION ROTATE ISOLATOR FULLY (CCNV) <br />PLD-2SEC <br />DLD 2SEC <br />DLD 5SEC <br />DLD 2SEC <br />V 3 GALLON PER HOUR LEAK SIMULATED TEST <br />HEX HEAD <br />HEX HEAD <br />- <br />II LEAK DETECTOR IDENTIFICATION <br />PRE-TEST CONDITIONS <br />VOLUME OF PRODUCT FLUSHED THRU LINE -f GALLONS <br />OTHER COMMENTS C:< c.. (alas <br />TEST PROCEDURE <br />LEAK DETECTOR INSTALLED <br />LEAK DETECTOR ISOLATED <br />TEST AT DISPENSER <br />FROM PRODUCT LINE -TEST AT PUMP PIT <br />CHECK TYPE <br />REFER TO LDT INSTRUCTIONS <br />III GENERAL LINE AND PUMP INFORMATION <br />III GENERAL PUMP INFORMATION <br />RECORD OPERATING PUMP PRESSURE 2-t psig. <br />FLUSH LDT TESTOR <br />AIR -VAPOR TEST WITH PUMP OFF MEASURE <br />RECORD OPERATING PUMP PRESSURE prig. <br />RED JACKET <br />RED JACKETRED <br />JACKET <br />TOKHEIM <br />OTHER <br />MODEL 116-030 <br />MODEL 116-017 <br />-MODEL 116-011 A <br />MODEL 585PM <br />POSITION ROTATE ISOLATOR FULLY (CCNV) <br />PLD-2SEC <br />DLD 2SEC <br />DLD 5SEC <br />DLD 2SEC <br />V 3 GALLON PER HOUR LEAK SIMULATED TEST <br />HEX HEAD <br />HEX HEAD <br />ROUND HEAD <br />SQUARE HEAD <br />A) MEASURE AND RECORD VOLUME IN <br />PRE-TEST CONDITIONS <br />VOLUME OF PRODUCT FLUSHED THRU LINE -f GALLONS <br />OTHER COMMENTS C:< c.. (alas <br />TEST PROCEDURE <br />LEAK DETECTOR INSTALLED <br />LEAK DETECTOR ISOLATED <br />TEST AT DISPENSER <br />FROM PRODUCT LINE -TEST AT PUMP PIT <br />REFER TO LDT INSTRUCTIONS <br />III GENERAL LINE AND PUMP INFORMATION <br />III GENERAL PUMP INFORMATION <br />RECORD OPERATING PUMP PRESSURE 2-t psig. <br />FLUSH LDT TESTOR <br />AIR -VAPOR TEST WITH PUMP OFF MEASURE <br />RECORD OPERATING PUMP PRESSURE prig. <br />AND RECORD So ML <br />IV PRESSURE STEP TEST <br />IV PRESSURE STEP TEST- SUBMERSIBLE PUMP <br />REMAINS ON THRU-OUT TEST PROCEDURE <br />WITH BOTTOM SELECTOR IN PRESSURE STEP TEST <br />WITH BOTTOM SELECTOR IN PRESSURE STEP TEST <br />POSITION TURN ON PUMP <br />POSITION ROTATE ISOLATOR FULLY (CCNV) <br />RECORD TIME IN SECONDS GUAGE <br />RECORD TIME IN SECONDS GUAGE <br />NEEDLE REMAINS IN COLORED ZONE SEC. <br />NEEDLE REMAINS IN COLORED ZONE SEC. <br />V 3 GALLON PER HOUR LEAK SIMULATED TEST <br />V 3 GALLON PER HOUR LEAK SIMULATED TEST <br />WITH BOTTOM SELECTOR IN 3 GPH TEST POSITION <br />WITH BOTTOM SELECTOR IN 3 GPH TEST POSITION <br />A) MEASURE AND RECORD VOLUME IN <br />A) MEASURE AND RECORD VOLUME IN <br />CALIBRATED BEAKER FOR 60 SECOND TEST 13S ML <br />CALIBRATED BEAKER FOR 60 SECOND TEST ML <br />B) OPEN DISPENSER NOZZLE OR PLACE BOTTOM <br />B) PLACE BOTTOM SELECTOR IN DISPENSER <br />SELECTOR IN DISPENSER NOZZLE POSITION. <br />NOZZLE POSITION. <br />FLOW RATE OF APPROX. 1112-3GAL PER MINUTE <br />FLOW RATE OF APPROX. 112-3GAL PER MINUTE <br />WILL BE OBSERVED. <br />WILL BE OBSERVED. <br />DOES GUAGE NEEDLE MOVE TO LOWER/ <br />DOES GUAGE NEEDLE MOVE TO LOWER <br />END OF COLORED ZONE YES ✓ NO <br />END OF COLORED ZONE YES NO <br />DOES FLOW RATE INCREASE TO APPROX. <br />DOES FLOW RATE INCREASE TO APPROX. <br />11/2-3GAL PER MINUTE YES -,-'NO <br />11/2-3GAL PER MINUTE YES NO <br />C) CLOSE DISPENSER NOZZLE OR PLACE BOTTOM <br />C) PLACE BOTTOM SELECTOR IN <br />SELECTOR IN 3GPH TEST POSITION: <br />3GPH TEST POSITION: <br />GUAGE RETURN TO COLORED <br />GUAGE RETURN TO COLORED <br />ZONE YES /NO <br />ZONE YES NO <br />GUAGE DOES NOT RETURN TO <br />GUAGE DOES NOT RETURN TO <br />' COLORED ZONE YES NO <br />COLORED ZONE YES NO <br />GAUGE GOES TO OPERATINGGAUGE <br />GOES TO OPERATING <br />PRESSURE YES NO <br />PRESSURE YES NO <br />PASS <br />PASS <br />PASSLEA <br />LEAK DETECTOR TEST <br />DETECTOR TEST <br />FAIL <br />PURPORA VAPORLESS FORM 880A C <br />5> <br />
The URL can be used to link to this page
Your browser does not support the video tag.