My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
140
>
2300 - Underground Storage Tank Program
>
PR0505687
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 2:34:40 PM
Creation date
11/5/2018 4:35:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0505687
PE
2361
FACILITY_ID
FA0006943
FACILITY_NAME
LATHROP GAS & FOOD INC
STREET_NUMBER
140
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19611007
CURRENT_STATUS
01
SITE_LOCATION
140 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\140\PR0505687\INSTALL 1995.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,_t fgtroth & Associates <br /> j- ,;! iG �I�[itects & Planners <br /> 95 J'JL 13 PH 2: 2.5 <br /> June 20, 1995 <br /> Robert McClellon, R.E.H.S. <br /> Environmental Health Division <br /> 445 N. San Joaquin Street <br /> Stockton, CA 95201 <br /> Dear Robert: <br /> I would like to address your concerns regarding our underground storage tanks at 140 Lathrop <br /> Road, Lathrop: <br /> 1. The overspill containment system we plan to use is a five gallon Phil-Tite overspill <br /> containment bucket. We specify the five gallon size on sheet TL7. <br /> 2. The overfill protection device we plan to use is an OPW 61 SO-41 Oc overspill <br /> prevention valve, which was included with our original cut sheets. We will indicate it <br /> on sheet TI-4, detail 3A. <br /> 3. We will note that"piping must undergo tightness test, by a state approved method, <br /> prior to final approval of installation"on sheet TI-2. <br /> Sincerely, <br /> ChibAe-Rl-uiz <br /> Project Architect <br /> 2115 J Street • Suite 213 • Sacramento, CA 95816 • 916.443.2560 • FAX 916.448 6583 <br />
The URL can be used to link to this page
Your browser does not support the video tag.