Laserfiche WebLink
0 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORINGPLAN (Page2of2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> L UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING Q 2.FLOAT AND CHAIN ASSEMBLY El3.ELECTRONIC STANDALONE 496x6 <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): <br /> PANEL MANUFACTURER: G;I M G 490-ss MODEL P Zb z0 49466. <br /> LEAK SENSOR MANUFACTURER: �rq 49657 MODEL H(S): ✓ 490.n <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES [Sb.NO 490'39 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN 13 a.YES ®b.NO 49060. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN 13 <br /> YES ®b.NO 49061 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT'AT THE DISPENSER. a YES � NO 49 61 <br /> L UDC CONSTRUCTION IS QI.SINGLE-WALLED ❑2.DOUBLE-WALLED 490.67 <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: III-LIQUID 2.PRESSURE 03.VACUUM 490-aa. <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YFS ❑b.NO 490646 <br /> VIL PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING: THIS FACILITY HAS SEEN NOTIFIED BY TI-]E STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49466. <br /> LE ION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE UBRID. 23 CCR 2641.1 <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 06" <br /> M 3.WML BUCKETS ARE TESTED ANNUALLY. <br /> 49667 <br /> VIII.RECORDKEEPIIG <br /> The following monitoliog/mamlenence records are kept for this facility: <br /> ®Alar logs 4946sa ❑Visual Inspection Accords 490666 ❑Tank integrity testing results 4946& <br /> ❑SIR testing results(end supporting documentation records). 49461k! ❑ Tank gauging results(and supporting documentation records). 49Dbse <br /> ❑ATG Testing results(and supporting documentation records).49msf ❑ Corrosion Protection 60-day logs 4w-hes <br /> g Equipment maintenance and calibration records. 4906sh <br /> IX TRAINING <br /> QPersonnel with UST monitoring responsibilities are familiar with all of the following documents relevant to thcirjob duties. 494690 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all That apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)496691 <br /> IS OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49069c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.694 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-696 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49 t <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49069s <br /> ❑ OTHER(Specify):mm M6a <br /> This facility has a"Desi grated U57 Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The-Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of him.This <br /> training will include,but is not limited to,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management Practices <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact penon(s)for emergencies and monitoring alarms.490-70 <br /> X: COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional tommustion on specific monitoring procedures am attached m this plan.49071 <br /> dve.- rvteatiaaPA-441 F14ppe✓ --Ie-+ -i- 'ISy <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Opcmtor is responsible for ensuring thin:1)the daily/routine UST monitoring activities and malate a nce of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following erson(s)are responsible for performing the monitoring and equipment main nco: <br /> NAME i 490-7I TITLE r�G6D:� ✓ 494n <br /> NAME '[" S' qV 490.74 TITLE r 49475 <br /> The Designated Operators I pert rm a monthly visual NsPec60n of the facility,provide a report to the owmdoperatoy and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XIL OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIG14 0049076 DATE: 494P7 <br /> eretm Pacili enbr onud <br /> APPLICANT NAME(print). tl, 490.70 +90.. <br /> APPLICANT e�'LO(4Thj lie la V <br /> UPCF UST-D(12!2007)3/4 <br />