Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> RESPONSE PLAN—PAGE 1 (one torm per fucihry) <br /> TYPE OF ACTION ❑ 1.NEW PLAN M2.CHANGE OF INFORMATION ROI. <br /> FACILITY ID q (Agency Use Only) - - <br /> BUSINESS NAME('Borne as FP/�CB.I]'Y/NA/��E) ROR, <br /> BUSINESS SITE ADDRESS <br /> xos. CITY Ron. <br /> This plan addresses unauthorized releases from UST systems and supplements <br /> Business Plan. the emergency response plans and procedures in the facility's Hazardous Materials <br /> > If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> D Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calender days,or sooner if required by the]ocal agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as bazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that , <br /> it is non-hazardous- Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> D Facility personnel will determine whether any water removed from secondary containment systems,or from clean-up activity, has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 fords <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> > We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the pmduct/waste stored in the primary containment system, is placed inside secondary containment to neat or neutralize <br /> released product/waste and the added material or resldting material from such a combination is not compatible with secondary containment. <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site Is listed m the facility's Ilarardous Matenals Business Plan This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Detective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE,BUT AVAILABLE FOR USE IF NEEDED: Com feta oN Ill livable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> Ric, Rre. <br /> A30. <br /> R11. 1121. mi. <br /> RIR, A22 <br /> RI2 <br /> RI]. <br /> X14. <br /> RR4. ]U4 <br /> RIS. R25. RIS. <br /> - <br /> - el <br /> THE FOLLOWING PERSON(S)fitARSPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40' TTTLE `J v�GrJY xso. <br /> NAME R41. TITLE xal, <br /> YlAvmhS 17•✓rJ JQ - <br /> NAME Rax TITLE <br /> Rsz. <br /> NAME xaa. <br /> TITLE <br /> RSa, <br /> 7MONITO�IUNG <br /> INDICATES A POSSIBLE THORiZED RELEASE,STEPS TO VERIFY TIE RELEASEWB,L BE MADEAS FOLLOWS: <br /> m testingordatacollection spection by qualified persons ❑Recalibrationof equipment <br /> 7 <br /> UST Response Plan(32008)-L3 <br />