Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORMW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pse I of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE [] I.MONTTORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- _ <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as FACILITY NAME) 3 <br /> BUSINESS SITE ADDRESSM0 LA-TAO-� 1b3 CITY LA <br /> 104 <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be perforated by qualified personnel. <br /> 23 CCR 2632 2634,2638 264! <br /> MONITORING EQUIPMENT IS SERVICED IANNUALLY [� 49.OTHER(specify): 490-3■ <br /> 490.36 <br /> M.MONITORING LOCATIONS <br /> ❑L NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLANIMAP PREVIOUSLY SUBMIT'T'ED. (23 CCR§2632, <br /> 2634)490.4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: 'g] a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490.6 <br /> PANEL MANUFACTURER: (Z>1LL 490-7. MODEL#:P 1 00 4904 <br /> LEAK SENSOR MANUFACTURER: +/ {LSQQ440'9 MODEL#(S): 4JZD 490-10 <br /> 2,AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKISI.(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490.14. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY Cl c.WEEKLY 49046 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-18 <br /> 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§1646.1): 4W20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a 36 HOURS ❑ b.60 HOURS 490-21 <br /> 490-22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: a.ANNUALLY 490-24 <br /> Q ❑ b.BIENNIALLY ❑ c.OTHER(specify): <br /> 490.25 <br /> 99.OTHER❑ S 490.26( Ii�') 490.21 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPET PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490.28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:9a.DRY ❑b.LIQUID FILLED 0c.PRESSURIZED ❑d UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER: G I 4ru_v E-PA c- 490'30 I MODEL#:j>AU2.tdiu v- 490.31 <br /> LEAK SENSOR MANUFACTURER: V t*,R {-pp T 112 1 MODEL#(S): 2 p 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(ix,,TURBINE)SHUTDOWN. Z a.YES ❑b.NO 44x34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 26 440.36 <br /> MILD MANUFACTURER(S): \J M% 490-37 MODEL#(S):t_D2OC10 490.38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURER(S) 440.40. MODEL#(S): 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p,h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-03 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.44 <br /> 4.PIPE INTEGRITY TESTING 490.45 <br /> TEST FREQUENCY a.ANNUALLY b.EVERY YEARS c.OTHERS i 490-46490-47 <br /> 5.VISUAL PIPE MONITORING. 490.48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 490-49 <br /> Allowed for maitanng of unburied emergency eneralor fuel piping only per HSS§Z5281.5@ 3 <br /> ❑ 6,SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1• 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑, 99.OTHER(Specify) 490.52 <br /> 490.53 <br /> UPCF UST-D(1212007)114 <br />