Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORffiW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> Vt.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> L UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-548 <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING -0 2,FLOAT AND CHAIN ASSEMBLY 1:13.ELECTRONIC STAND-ALONE 490.54b <br /> ❑ 4.NO DISPENSERS ❑99.OTHER(Specify): <br /> PANEL MANUFACTURER: G 1 L BA R-(-O 16 MC, 49o-s5 MODEL#: db 0 490-56 <br /> LEAK SENSOR MANUFACTURERAJb 49o-57 MODEL#(S) IrtDA.I C )JUS 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ®b.NO 49°59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 490-60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ®b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑ a.YES ISI b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS 0I.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: El 1.LIQUID 0 2.PRESSURE Q 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490.641 <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49x65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.l <br /> ❑2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS, 490.66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 4W-68a ❑Visual Inspection Records 490-68b ❑Tank integrity testing results 490.68c <br /> SIR testing results(and supporting documentation records). 490.68d ❑ Tank gauging results(and supporting documentation records). 49"M <br /> ❑ATG Testing results(and supporting documentation records).49o-al ❑ Corrosion Protection 60-day logs 49o-68S <br /> Equipment maintenance and calibration records. 490.6ah <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 4922.69. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ❑ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-M <br /> I3 OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49"9e <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69a <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: `HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-690- <br /> ❑ OTHER(Specify):M691%M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> Names of contact person(s)for emergencies and monitoring alarms.490.7o <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.49o.7 i <br /> M.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance. <br /> NAME I 49f1-72 TIILF. 2e&s) 'l` 490-73 <br /> NAME 490-74 TITLE ipp <br /> cCl 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNERIOPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information providedhei n is true and accurate to the best of my knowledge. <br /> APPLICANT SIG0-90-76 1 DATE: 490-77 <br /> f <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE: 490,19 <br /> UPCF UST-D(12/2007)314 <br />