My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
140
>
2300 - Underground Storage Tank Program
>
PR0505687
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 12:02:27 PM
Creation date
11/5/2018 4:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0505687
PE
2361
FACILITY_ID
FA0006943
FACILITY_NAME
LATHROP GAS & FOOD INC
STREET_NUMBER
140
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19611007
CURRENT_STATUS
01
SITE_LOCATION
140 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\140\PR0505687\BILLING 2013 - 2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Page I of 2) <br /> FPLAN <br /> OF ACTION ❑ I.NEW PLAN 2.CHANGE OF INFORMATION 490-1 <br /> TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 4902 <br /> (Check one item only) ❑ 2.'PHIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(Sp <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only <br /> BUSINESS NAME(Same as FACILITY NAME) 1 3, <br /> BUSINESS SITE ADDRESS O a Qp. 103 CITY �1 104. <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE 1 <br /> Testing preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCA_2632,2634,2638,2641 <br /> __ _ �_______-________--____ <br /> ----- <br /> MONITORING EQUIPMENT IS SERVICED19 I.ANNUALLY ❑ 99.OTHER(Specify): 490-3a <br /> 490-36 <br /> III.MONITORING LOCATIONS <br /> 2634 4904 <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> L CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT 490-5 <br /> VAULTS)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 49M <br /> PANEL MANUFACTURERF�� - �y�-���--/` �-j-_ 490-7. I--ODEL#__- �, -S'�--_4%=8 <br /> LEAK SENSOR MANUFACTUREF iy� ,A,, s ` 490-9. 11 490-10 <br /> _V MIL-PZO C I MODEL#(S): <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED T MONIT R SINGLE WALL TANKS) (23 CCR§2643) 490.11 <br /> __PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: ____________ 490-14. MODEL#(S): 4vo-1s <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS <br /> ❑ b.DAB.Y/NIGHTLY ---❑ <br /> C. <br /> WEEKLY -- 490-16 <br /> ------ ❑ d.MONTHLY ❑ e.(2'fHER(SpeCilL 490-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-18 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49N21 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 49122 <br /> 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 49024 <br /> 490-25 <br /> ❑99.OTHER (Specify): <br /> 490,26 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) 490-2] <br /> 911.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490.28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:❑a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM�� 490-29 <br /> PANEL MANUFACTURER: - � (♦,�Q-OO'r a9o.3o MODEL#: SI,..,�.)(1-------- 490-31 <br /> LEAK SENSOR MANUFACTURER: 1'CC1� 496-32 --- 490-33 <br /> - <br /> - IILO� _-_-- ___ _MODEL#(S) <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49035 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g,p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> _- PRODUCT FLOW WHEN A LEAK IS DETECTED C23 CCR§2636) __ _ __ ___ 490-36 <br /> MELD MANUFACTURER(S): fL 490.3] MODEL#(S): __FW LpoJ' 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> ELLD MANUFACTURER(S) _ _________ 49040. MODFL#(S): 49041 <br /> PROGRAMMED IN LINE LEAK TEST: 11I.MINIMUM MONTHLY 0.2 <br /> g.p.h. El2.MINIMUM ANNUAL O.l g.p.h, 49abz <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490.43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. [Da.YES ❑b. 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49o4s <br /> TEST FRE UENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS eci 4904649047 <br /> 5.VISUAL PIPE MONITORING. <br /> 490.48 <br /> FREQUENCY ❑ a.DAILY <br /> ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' <br /> 'Allowed far monitorin ofunburied emer me eneramr Poel i n oN er HSC&25381.56 3 49x49 <br /> - <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(x)(3)1. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ 99.OTHER(Specify) <br /> 490-52 <br /> 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.