Laserfiche WebLink
9 • <br />CODInlents — (include information on repairs made prior to testing, and recor)rn2ended follow-up for failed tests) <br />Page of <br />S, SECONDARY PIPE TESTING <br />'fest Method Developed By: <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />®Pressure <br />❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure gauge, stop watch <br />Equipment Resolution: 1.0 <br />Piping Run # <br />Piping Run #Supreme Piping Run # Piping Run # <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />A.O. Smith <br />Piping Diameter: <br />3" <br />Length of Piping Run: <br />200 ft <br />Product Stored: <br />Supreme <br />Method and location of <br />test boot <br />piping -run isolation: <br />Wait time between applying <br />pressurelvacuumlwater and <br />10 mins <br />starting test: <br />Test Start Time: <br />10:37 <br />Initial Reading (Rj): <br />4 psi <br />Test End Time: <br />11:37 <br />Final Reading (RF): <br />4 psi <br />Test Duration: <br />60 mins <br />Change in Reading (RF-Rj): <br />0 <br />Pass/Fail Threshold or <br />0 psi / 60 mins <br />Criteria: <br />Test Result• <br />❑ Pass F1Fail <br />® Pass ❑ Fail ❑ Pass ❑ Tail E] Pass ❑Fail <br />CODInlents — (include information on repairs made prior to testing, and recor)rn2ended follow-up for failed tests) <br />