Laserfiche WebLink
MONITORING SYSTEM CERTIFICATION <br /> CERTIFICATION /TEST DATE: September 19, 2017 <br /> Al. FACILITY A2. OWNER <br /> Name Colonial Energy()40135 Name Colonial Energy, LLC. <br /> Address 192 Lathrop Road,Lathrop,CA 95330 Address 2860 N.Santiago Blvd.2nd Floor,Orange,CA 92867 <br /> Phone# 209-858-4998 Phone# 714-761-5426 <br /> Contact Station Manager Contact Victor Hassan <br /> F. IN-TANK GAUGING/SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,Including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? _ <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ■ N/A (check all that apply) Simulated leak rate: ■ 3g.p.h.; ❑ 0.1 g.p.h.; El0.2 g.p.h. <br /> ❑ Yes ■ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ■ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow If it detects a leak? <br /> ■ WA <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ■ Yes ❑ No" For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ WA or fails a test? <br /> ■ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> ❑ Yes ■ No* Were all items on the equipment manufacturer's maintenance checklist completed? - <br /> ' In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> Not conducting a monitoring certification and not a tester so no testing equipment on site or tester. I did conduct a <br /> on all grades at TLS through Line leak test in diagnostics and all passed. <br /> R - .IV <br /> nrT , e ' ng <br /> U 2017 Watton Engineering,Inc. _, <br /> Page 3 of 3 - - <br />